Published

    Refonte du système d'information Routes et Rivière (SIR) de la Direction des Infrastructures de Mobilité : Gestion des données de la route, gestion des données de la rivière, saisie sur le terrain, programmation des travaux Mise en oeuvre, maintenance, assistance et prestations associées

    Notice number: 26-73420

    🇫🇷 FranceConseil Départemental de la MayenneServices

    KEY INFORMATION

    Submission deadline
    Sep 17, 2026
    Location
    🇫🇷 France
    Contracting authority
    Conseil Départemental de la Mayenne
    Accepted Languages
    FRA
    Tender type
    Services
    Contract Value
    Published date
    Jul 24, 2026

    TENDER DESCRIPTION

    This procurement is for the comprehensive redesign of the Roads and River Information System (SIR) for the Directorate of Mobility Infrastructures, focusing on road data management, river data management, field data entry, and work scheduling. The extensive scope includes the initial design and implementation of the tool, provision of additional services like user training and data interfacing, and ongoing hosting, maintenance, and support. Key technical requirements specify adherence to a robust project methodology, Role-Based Access Control (RBAC), specific exchange platforms (Webmethods or FME), integration with BusinessObjects, authentication via SAML (AzureAD) and internal AD, various protocols (HTTP/S, SOAP, REST, WS, JMS), Swagger for API documentation, Android Auto compatibility, and RGAA AA level accessibility conformity. This framework agreement is set for a duration of four years from an expected contract notification around late 2026, with an estimated value between €115,000 and €400,000, excluding VAT.

    TENDER BRIEF

    The contract timeline is structured as follows:

    The framework agreement is for a duration of 4 years, commencing from the date the contract is notified. The provisional date for contract notification is October 6, 2026, or around November 25, 2026. The provisional notification date for the order for Prestation A is October 9, 2026.

    Key milestones and phases for Prestation A are:

    • Project Initialization: This phase has a maximum duration of 2 months starting from the notification of the order for Prestation A. The theoretical launch meeting date is October 15, 2026.
    • Ready for Operation (Mise en Ordre de Marche - MOM): This phase lasts a maximum of 9 months from the validation of project initialization. The theoretical start date is December 9, 2026, with a theoretical end date of September 8, 2027.
    • Acceptance Testing (Vérification d'Aptitude - VA): This phase has a maximum duration of 5 months from the validation of the MOM. The theoretical start date is September 9, 2027, and the theoretical end date is February 8, 2028. The theoretical go-live date is also February 8, 2028.
    • Regular Service Validation (Validation de Service Régulier - VSR): This phase lasts 3 months from the validation of the VA. The theoretical start date is February 9, 2028, and the theoretical end date is May 7, 2028.

    Prestation C, which includes hosting, maintenance, and assistance services, will be effective from the acceptance of Prestation A (VSR validation) until the end of the framework agreement.

    It is noted that these dates are indicative, and the bidder is expected to present their target schedule in their offer.

    Sources

    • 103_CCAP_2026S020P2.pdf — “telle que prévue à l'article 5.1 du CCAG-TIC. Le titulaire doit informer ses sous-traitants des obligations de confidentialité et/ou des mesures de sécurité. 4- Durée et délais d'exécution 4.1 - Durée du contrat L'accord…
    • 2MPI1853873_AAPC.pdf — “L2125-1 $1^{\circ}$, R. 2162-1 à R. 2162-6, R. 2162-13 et R. 2162-14 du Code de la commande publique. Il donnera lieu à l'émission de bons de commande. Il est passé pour une durée de 4 ans à compter de la date de notific…
    • 304_CCTP_SI ROUTIER_2026S020P2.pdf — “étapes décrites ci-dessous. Les dates sont présentées à titre indicatif, le soumissionnaire présentera dans son offre son planning cible. Date prévisionnelle de notification du marché: 6 octobre 2026 Date prévisionnelle…

    The core scope of work for this tender is divided into three main prestations: Initial Design and Implementation of the Tool (Prestation A), Additional Services (Prestation B), and Hosting, Maintenance, and Support (Prestation C).

    Prestation A - Initial Design and Implementation of the Tool encompasses project management, technical and functional design, solution installation, environment provision, interconnection with the enterprise directory for authentication, data recovery with associated testing, configuration, and production deployment. It also includes the implementation of expected functionalities, compliance with accessibility levels, and the implementation and testing of GIS interfaces and Raster flow interfaces. Furthermore, it covers the design and implementation of various specialized tools such as a boat counting tool for locks, a mapping and monitoring tool for fluvial heritage, an accident monitoring tool, a winter road viability survey tool, a road counter monitoring tool, and a road operation monitoring tool. The implementation of data visualization and valorization reports (BI or GIS type) is also part of this prestation.

    Prestation B - Additional Services involves the recovery of attached documents into the solution, user training (for data entry, consultation, and road operation agents), and various interfacing activities. These include interfacing with AGT360 and Webtrafic via Webmethod/FME/direct native interfaces, covering specification, implementation, and testing. Interfacing with a BI solution (BusinessObjects) and its associated testing are also included. This prestation also covers the design and implementation of a road and fluvial heritage inventory tool, as well as complementary service days for technical or functional assistance provided by consultants, technicians, or coordinators, both remotely and on-site. Specific evolutions requested by the Department (excluding regulatory) and the definition and implementation of a complementary interface are also part of this scope.

    Prestation C - Hosting, Maintenance, and Support includes the hosting of the solution on the candidate's servers, the provision of user licenses for production and qualification environments, annual corrective and evolutive maintenance, and user assistance along with functional and technical expertise via WEB and telephone.

    The project execution involves two key phases:

    1. Project Initialization: This phase requires the presentation and validation of technical and functional choices, a risk matrix, working modalities between the contractor and the Collectivité, a definitive project plan, and associated resources. Key deliverables for this phase include a Quality Assurance Plan (PAQ), a Security Assurance Plan (PAS), launch meeting minutes, a detailed implementation schedule up to production deployment, workload distribution, a Technical Architecture Document (DAT) for network infrastructure, flows, hardware, service accounts, solution deployment, and target architecture, API documentation, a data recovery plan, and a list of stakeholders and their contact information.

    2. Operationalization (MOM - Mise en Ordre de Marche): This phase involves conducting workshops for solution parameterization, performing functional and technical parameterization on a preliminary environment, and holding quadripartite specification workshops to define interface contracts. It also includes participating in the implementation of interfaces on a preliminary environment, validating interfaces and interconnection with the enterprise directory for authentication, and recovering data from the existing solution (SIR). Expected deliverables for MOM are a solution installation file, a detailed solution functionalities file, an exploitation file (DEX), an updated implementation plan, a parameterization notebook, a methodology for creating a data section in SIR, a functional acceptance test plan, and a data recovery acceptance test plan.

    Sources

    • 103_CCAP_2026S020P2.pdf — “prestations associées. Cet accord-cadre fixe toutes les conditions d'exécution des prestations, il est exécuté au fur et à mesure de l'émission de bons de commande émis par le pouvoir adjudicateur. 1.2 - Décomposition du…
    • 205_BPU_DQE_SI ROUTIER_2026S020P2.xlsx — “(historiques des données),,,,, Reprise des données liens vers les documents (tables documents joints),,,,, Recettage de la reprise de données des référentiels,"4.12 Tests, recettage et mise en production",,,, Recettage d…
    • 304_CCTP_SI ROUTIER_2026S020P2.pdf — “ces points devront être échangés et validés lors d'une réunion de lancement. Livrables attendus: ➤ Plan d'Assurance Qualité (PAQ) et le Plan d'Assurance Sécurité (PAS); ➤ compte-rendu de la réunion de lancement; planning…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 12 FILES

    • 06_Cadre de reponse_SI ROUTIER_2026S020P2.xlsx
    • MPI1853873_AAPC.pdf
    • 02a_AE_ANNEXE_COTRAITANTS.docx

    and 5 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders