Published

    Refonte et remotorisation du navire Les Deux Rives (relance)

    Notice number: 26-74411

    🇫🇷 FranceLorient AgglomérationGoods

    KEY INFORMATION

    Submission deadline
    Sep 18, 2026
    Location
    🇫🇷 France
    Contracting authority
    Lorient Agglomération
    Accepted Languages
    FRA
    Tender type
    Goods
    Contract Value
    Published date
    Jul 26, 2026

    TENDER DESCRIPTION

    This tender seeks a qualified contractor for the comprehensive overhaul and re-motorization of the vessel "LES DEUX RIVES". The scope of work includes extensive modifications such as keel alteration, enlargement and ergonomic enhancement of the wheelhouse, rearrangement and insulation of the passenger lounge, raising of the aft platform, and creation of bicycle parks, alongside a complete electrical architecture overhaul and the supply and installation of new engines with all necessary auxiliaries, backed by a minimum two-year warranty on the propulsion system. Key technical requirements mandate conformity to applicable standards for materials and equipment, relevant quality and environmental certifications, eIDAS-compliant electronic signatures, and all works and modifications must achieve the satisfaction and validation of Bureau Veritas. The contract has a provisional duration of 24 months, excluding the warranty period, with a maximum execution period of 12 months from contract notification, and bidders must provide their annual turnover for the last three years as part of the financial standing requirements.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract Start Date: The contract starts from the date of notification.
    • Total Duration: The provisional duration of the contract is 24 months, excluding the warranty period. It concludes with the completion of services and the financial settlement.
    • Execution Period: The maximum execution period is 12 months, excluding the warranty period, also commencing from the contract's notification.
    • Key Milestones/Phases (Payment Milestones):
    • 5% after validation of design studies.
    • 15% after ordering the engines, upon justification.
    • 10% after delivery of the engines.
    • 5% after installation of the engines.
    • 10% at the commencement of hull works.
    • 10% at the commencement of wheelhouse works.
    • 10% at the commencement of passenger lounge and aft platform works.
    • 5% at the completion of hull works.
    • 5% at the completion of wheelhouse works.
    • 5% at the completion of passenger lounge and aft platform works.
    • 10% after the completion of tests, training, and commissioning.
    • Final payment of 5% upon admission.

    Sources

    • 126059_AE.docx — “Objet de l’acte d’engagement 2.1 – Objet du marché Le présent marché a pour objet la refonte et la remotorisation du navire LES DEUX RIVES comprenant : Etudes/certifications et dossiers règlementaires Fourniture et pose…
    • 226059_CCAP.pdf — “des études de conception N° 2 15% après commande des moteurs, contre justificatifs N° 3 10% après livraison des moteurs N° 4 5% après montages des moteurs N° 5 10% au démarrage des travaux de coque N° 6 10% au démarrage…

    • Conformity to applicable standards for materials and equipment.
    • Certifications or labels attesting to the quality of suppliers or products.
    • Environmental certifications or labels.
    • Electronic signature certificates must conform to the eIDAS regulation and the French decree of April 12, 2018, related to electronic signatures in public procurement.
    • Works and modifications must be realized to the satisfaction and validation of Bureau Veritas.

    Sources

    • 126059_RC.pdf — “réalisations des essais avant admission • Description des garanties techniques offertes (durée, étendue, conditions) • Liste et caractéristiques des matériaux et équipements envisagés, avec indication de leur conformité…
    • 226059_CCAP.pdf — “Maitrise d’Ouvrage, de la Société de Classification et des Affaires Maritimes en tant que de besoin, prévenus par écrit par le titulaire quinze jours calendaires au moins avant le début de ceux-ci. Pendant les essais sur…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 23 FILES

    • 26059_CCAP.pdf
    • PA LES DEUX RIVES 20201106.pdf
    • 26059_DPGF.xlsx

    and 16 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders