Regional-Stadtbahn Neckar-Alb Projektgesellschaft mbH - Europaweite Vergabe von Planungsleistungen für die Entwurfs- und Genehmigungsplanung der Regional-Stadtbahn Neckar-Alb
Notice number: ocds-mnwr74-ce416a79-5336-472a-b126-18ea5e84b1f0
KEY INFORMATION
- Submission deadline
- • Sep 8, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Regional-Stadtbahn Neckar-Alb Projektgesellschaft mbH
- Accepted Languages
- DEU
- Tender type
- Services
- Contract Value
- Published date
- Aug 4, 2026
TENDER DESCRIPTION
This tender invites proposals for comprehensive planning services covering the draft and approval planning (HOAI service phases 3 and 4) for the approximately 7 km first section of the Regional-Stadtbahn Neckar-Alb's BOStrab infrastructure, specifically the critical connection to the DB InfraGO railway network in Reutlingen. The scope includes interdisciplinary planning for track, engineering structures, traffic systems, structural engineering, and technical equipment such as LST, overhead line systems for 16.7 Hz and 750 V DC, 50 Hz systems, and light signal systems, while managing interfaces between BOStrab and EBO infrastructure, system changes (750 V DC and 15 kV AC), and coordination with DB InfraGO. All planning services must be executed according to the BIM method (BIM-5D) to deliver a fully coordinated, approval-ready design including all submission documents for the plan approval procedure. Financial standing requirements mandate a declaration of annual turnover for the past three business years, including comparable railway planning services, and professional liability insurance with a minimum coverage of EUR 5,000,000 for personal injury, property damage, and financial…
TENDER BRIEF
The contract timeline is not explicitly stated in the documents. While there is a mention of "Vertragslaufzeit" (contract term/duration), no specific start date, end date, or total duration for the contract itself is provided. The documents do outline a timeline for the *tender process*, which includes:
- Phase 1 - Teilnahmewettbewerb (Participation Competition): The deadline for submitting the participation application is September 8, 2026, 12:00 PM.
- Phase 2 - Angebots- und Verhandlungsphase (Offer and Negotiation Phase): This phase follows Phase 1, where selected companies are invited to submit offers and engage in negotiations.
Sources
- 1260805-Bewerbermemorandum_6.pdf — “Verhand- lungen einzutreten. Die Vergabestelle behält sich vor, im Rahmen des ggf. anschließenden Verhandlungsver- fahrens, sukzessive weniger gut platzierte Bieter auf Grundlage einer Bewertung nach den Vorgaben der Bew…”
The core scope of work for this tender involves planning services for the design and approval planning (service phases 3 and 4) of the first section of the BOStrab infrastructure, specifically the connection to the DB InfraGO railway network in Reutlingen. This section is approximately 7 km long and includes system change points for the Neckar-Alb-Bahn. The project aims to continue planning based on existing preliminary designs (including a preferred route from 2026) to achieve approval readiness and prepare all necessary documents for a plan approval procedure.
The planning encompasses the interdisciplinary processing of all required trades for design and approval, as well as the coordination of accompanying expert opinions. Key aspects include managing interfaces between BOStrab and EBO infrastructure, planning several engineering structures (overpasses and underpasses), designing system change points between 750 V DC and 15 kV AC, and coordinating with DB InfraGO.
The project is divided into several sub-areas:
- Sub-area 1.1.1: Branch towards Metzingen.
- Sub-area 1.2.1: Connecting track to DB Reutlingen West.
- Sub-area 1.2.2: Tram line depot (excl.) track triangle Tübinger Straße - Reutlingen West.
- Sub-area 1.2.3: Tram line track triangle Tübinger Straße - track triangle Listplatz.
- Sub-area 1.3.1: Tram line Reutlingen West junction Galgenberg (branch towards Tübingen).
- Sub-area 1.3.2: Tram line junction Galgenberg - Markwiesenstraße.
The required planning services, in accordance with HOAI service phases 3 and 4, include:
- Object planning, inclusive of service phases 1 and 2 (e.g., buildings for substations, toilets, switch houses).
- Traffic system planning.
- Engineering structures planning.
- Structural engineering planning.
- Technical equipment planning (LST, 16.7-Hz systems including overhead line equipment (OLA), 750-V-DC systems including OLA, 50-Hz systems, and light signal systems (LSA)).
- Other services, such as interdisciplinary coordination, approval services, and surveying services.
All planning services must be executed using the BIM method (BIM-5D), with the ultimate goal of producing a fully coordinated, approval-ready design and approval planning, complete with all necessary documents, verifications, reports, plans, and models for the plan approval process.
Sources
- 1260805-Bewerbermemorandum_6.pdf — “der Regional-Stadtbahn Neckar-Alb Bewerbermemorandum Seite 3 von 13 Seiten 1 Gegenstand des Verfahrens Die zukünftige Infrastruktur der Regional-Stadtbahn Neckar-Alb besteht aus Reaktivierungs- , Ausbau- und Neubaustreck…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 2 FILES
- 260805-Bewerbermemorandum_6.pdf144 KBPDF
- 260805-Anlage 1-Teilnahmeformular_2.pdf385 KBPDF
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.