    Réhabilitation de l'ancienne boulangerie et rénovation énergétique des logements

    Notice number: 26-74031

    🇫🇷 FranceMairie CapvernWorks

    KEY INFORMATION

    Submission deadline
    Sep 15, 2026
    Location
    🇫🇷 France
    Contracting authority
    Mairie Capvern
    Accepted Languages
    French
    Tender type
    Works
    Contract Value
    Published date
    Jul 23, 2026

    TENDER DESCRIPTION

    This tender invites proposals for comprehensive construction services focused on the rehabilitation of a former bakery and the energy renovation of housing units. The extensive scope of work includes all necessary site installations, detailed preparatory works such as state-of-existing-conditions assessments, technical studies, and rigorous adherence to hygiene and safety protocols. Key deliverables encompass asbestos and lead removal, termite identification, full demolition of existing structural and non-structural elements, and significant structural works including earthworks, foundation reprises, new masonry walls, and concrete element implementation. Furthermore, the project requires the complete execution of Voiries et Réseaux Divers (VRD), covering network infrastructure demolition and installation, exterior works like road construction and signaling, and integrated wastewater and rainwater management systems. All works must comply with current French standards (Normes et DTU en vigueur) and professional best practices, while financial standing requirements are not specified and the overall contract timeline is not explicitly stated, although detailed execution and phasing…

    TENDER BRIEF

    The contract timeline, including the contract start date, end date, total duration, and any key milestones or phases, is not explicitly stated in the provided documents. While some activities like waste management are listed for a duration of 12 months, this is not indicated as the overall contract duration. The term "Phasage" is mentioned, and a "Planning d'exécutions des travaux" is listed as a document to be submitted, but the actual timeline details are absent.

    Sources

    • 1DPGF LOT 2.pdf — “bennes de chantier | Ens | 1.0 | 4.13 | Aires de livraisons et de stationnements | Ens | 1.0 | 414 | Utilisation et entretien des voines | | | | Voiries intérieures au site et aux aires de chantier | Eng | 1.0 | | Voirie…
    • 2Lot 1 - VRD.pdf — “rue du 14 juillet 1789 65130 CAPVERN COMMUNE DE CAPVERN 1 Place Aragon 65130 CAPVERN Architecte : peretto & peretto to&peretto Architectes Peretto & Peretto Architectes 4 Rue de l'Hôtel de Ville 65100 LOURDES Bureau étud…

    The core scope of work for this tender primarily involves the rehabilitation of an old bakery and the energetic renovation of housing units.

    The Statement of Work summary and core deliverables are divided into at least two main lots:

    Lot 2: Demolition, Structural Work (Gros Œuvre), and Asbestos Removal

    • Site Installations: This includes planning, installing, maintaining, and removing site fences, access points, signage, temporary mats, site offices (base de vie), lifting equipment, common safety devices, scaffolding, temporary shoring, and temporary electrical, water, and sanitation connections. It also covers material storage areas, delivery and parking areas, waste bins, waste evacuation and treatment, site cleaning, and the dismantling of all site installations.
    • Preparatory Works: Key tasks involve conducting a state-of-existing-conditions assessment by an approved bailiff, performing technical studies (including structural execution studies, structural recognition soundings, G3 and G4 missions), handling DICT (Déclaration d'Intention de Commencement de Travaux), conducting surveys for demolition and deposit, setting levels, providing general protection, and ensuring hygiene and safety on site.
    • Asbestos Removal Works: Deliverables include the identification of asbestos-containing materials, identification of lead-containing materials, termite identification, development of a removal plan, setting up specific site installations, confinement procedures, analysis and measurement of dust levels, cleaning and restoration of premises, waste management, execution of asbestos removal works, and the compilation of an end-of-site file.
    • Demolition Works: This encompasses the demolition of various elements such as chantier bins, roofs (steel/timber, terrace), metal framework, masonry walls (interior, load-bearing), existing slabs (ground floor, R-1), existing wooden floors, and an existing tank. It also includes purging demolished foundations, evacuating rubble and waste, and general dust removal and cleaning.
    • Structural Works and Masonry (Gros Œuvre): This involves complementary earthworks, reprises of foundations and slabs, construction of masonry walls, creation and obturation of openings, and the implementation of concrete elements like beams, lintels, and posts.

    Lot 1: VRD (Voiries et Réseaux Divers - Roads and Various Networks)

    • Site Installations: This covers the supply, installation, maintenance, removal, and site restoration of all necessary elements, including site barracks, lifting equipment, various site equipment, access roads, and sorting bins.
    • Earthworks: This includes excavation for building foundations, providing materials and provisions to maintain dry excavations, and implementing all necessary shoring and protection for excavations and existing foundations.
    • Studies and Plans: Deliverables include all required studies, calculations, execution and detail drawings, nomenclatures, and the establishment of execution, reservation, and site plans.
    • Material Supply and Implementation: This involves the supply, transport, and implementation of all necessary materials, products, and construction components.
    • Masonry and Finishes: This includes laying and sealing of siphons, fixing of structures, provision of labor and supplies for finishes and verifications, tracing and implementation of masonry walls, masonry partitioning, and masonry works directly linked to second-phase works such as bases, holes for sealing and caulking.
    • Network Infrastructure: This covers the demolition and disconnection of existing pipes, abandoned or out-of-service electrical lines, plugging of networks to be maintained, installation of buried networks within buildings and up to one meter from facades, and the placement of networks, pipes, sleeves, and manholes as per plans or industry standards.
    • Exterior Works: This includes the creation of roads with black asphalt finish, deactivated concrete coatings, curbs, horizontal and vertical signaling, wastewater sanitation systems, and rainwater management principles and networks.
    • Site Cleaning and Waste Management: This involves regular cleaning and removal of all waste and debris resulting from the works, and their transport to public landfills.
    • General Site Activities: This includes verifying support conditions, various implantations, tracing level lines, and materializing plumb lines and finished exterior and interior surfaces.

    Sources

    • 1DPGF LOT 2.pdf — “| Cors | | 5.4 | Repérage de dépose et démolition | Ens | 1.0 | 5.5 | Trait de niveau | Cprs | | 5.6 | Protection générale | Ens | 1,00 | 57 | Hygiène et sécunte | pm Total chapitre | | 6 | DESCRIPTION DES TRAVAUX DE DES…
    • 2Lot 1 - VRD.pdf — “de tous les éléments et produits nécessaires à la bonne tenue et au parfait achèvement des ouvrages, dont notamment: L'amenée, la mise en place, la maintenance, le repli et la remise en ordre du site en fin de travaux de…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 58 FILES

    • Lot 8 - ELEC.pdf
    • Lot 3 - Charpente - Couverture.pdf
    • OC25151 DCE BOULANGERIE CAPVERN PLANS CVC PB IND A-CVCPB01.pdf

    and 51 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders