Restructuration et extension du club d'aviron d'Aix-les-Bains.
Notice number: 26-73660
KEY INFORMATION
- Submission deadline
- • Sep 21, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Ville d'Aix les Bains
- Accepted Languages
- French
- Tender type
- Works
- Contract Value
- Published date
- Jul 23, 2026
TENDER DESCRIPTION
This tender seeks a contractor for the comprehensive restructuring and extension of the Aix-les-Bains rowing club, encompassing project management, demolition with asbestos removal, extensive infrastructure and earthworks, and specialized electrical installations for both heavy (CFO) and light currents (CFA), including VDI, Fire Safety (SSI), and access control systems. Key technical requirements mandate the use of CANECO and ECODIAL software, specific cable types, and strict adherence to numerous NF and NF EN standards, while prohibiting galvanized steel pipes and glued PVC products. The project has a provisional duration of 19 months for works, commencing with a 4-week preparation period from market notification, with major milestones including watertight completion by September 2027 and final reception by May 31, 2028. Bidders must demonstrate financial regularity through various attestations (Urssaf vigilance, fiscal regularity, social contributions), provide civil and decennial liability insurance, and meet specific documentation requirements for financial standing.
TENDER BRIEF
The contract timeline includes the following details:
- Contract Start Date: The contract will commence upon its notification date. The overall project is scheduled to begin on June 18, 2026.
- Contract End Date: The final reception of works is scheduled for May 31, 2028.
- Total Duration:
- The provisional duration for the works is stated as 19 months.
- The global provisional execution period is broken down as:
- Preparation period: 4 weeks from market notification.
- Execution of works: 83 weeks from the service order to commence works.
- Operations preceding reception (OPR): 2 weeks.
- Lifting of reserves: 1 week.
- The overall project dates span from June 18, 2026, to May 31, 2028.
- Key Milestones or Phases:
- Preparation Period: 4 weeks, starting from the market notification.
- Execution of Works: 83 weeks, commencing with the service order.
- HORS D'EAU (Watertight completion): September 15, 2027.
- HORS D'AIR (Airtight completion): October 13, 2027.
- TEST ETANCH 1/2 (Waterproofing Test 1/2): November 3, 2027.
- TEST ETANCH 2/2 (Waterproofing Test 2/2): March 1, 2028.
- Opérations Préalables à Réception (OPR): May 10, 2028, to May 30, 2028 (2 weeks).
- Réception (Reception of works): May 31, 2028.
- Garantie de parfait achèvement (Perfect completion guarantee): 52 weeks, starting from the reception of works.
Sources
- 1CCAP.pdf — “les groupes d’étude et de marchés. 1.2. Forme du marché Le marché sera passé selon la procédure adaptée prévue à l’article R 2123-1 du code de la commande publique 1.3. Délai prévisionnel d’exécution des travaux Le march…”
- 2DCE41_Planning général.pdf — “P155-planning_prev_DCE ICMArchitectures - Hors les Murs Chef de projet Dates du projet Avancée Tâches Ressources 18 juin 2026-31 mai 2028 0% 88 0 15 juil. 2026 http:// P155-planning_prev_DCE Tâches Nom | Date de début |…”
- 3AE.doc — “l article 18.1.1. du CCAG Travaux. - 83 semaines d cution des travaux compter de l ordre de service qui prescrira le commencement des travaux, - 2 semaine d rations pr alables ception - 1 semaine de lev e de r serves - C…”
The core scope of work and statement of work summary for this tender involves a multi-faceted construction or renovation project with several key areas:
1. Project Management and Documentation: This includes the realization of execution studies such as calculation notes, execution plans, detailed drawings, interfaces with other trades, and synthesis studies to ensure spatial coherence of all elements. It also requires the submission of a Dossier des Ouvrages Exécutés (DOE), which includes as-built plans and potentially as-built plans for buried networks, provided in both paper and digital formats.
2. Demolition and Site Preparation: Tasks involve site visits and condition assessment, organizing work on existing structures, and the demolition or removal of existing electrical installations (including power lines, disconnections, electrical consignments, and identification of obsolete installations). It also includes the removal of existing functional LED lighting and other identified equipment for handover to the contracting authority. A significant part of the preparation involves asbestos removal, which necessitates specific safety installations such as regulated work zone signage, fencing, collective protections, static and dynamic containments, air extractors with HEPA filters, controlled depressurization of confined areas, and personnel and material decontamination units.
3. Infrastructure and Earthworks: This covers the general installation of the construction site, including opening existing fences, creating access roads, establishing storage areas, and site restoration. Extensive earthworks are required, such as stripping existing asphalt and topsoil, mass excavation, demolition of existing foundations, evacuation of excess soil, and removal of existing fences. It also includes trenching for various networks (e.g., EP, Gaz neutralization/removal, PAC connection, EU, Elec, infiltration swale overflow, IRVE provision), common trenches, and excavations for specific structures like a 10m3 rainwater recovery tank and infiltration swales. The scope extends to the creation of roads and pavements (asphalt for light vehicles, permeable pavers, concrete curbs, and adjustment of existing manholes), installation of various canalizations (EP, EU, AEP), network conduits, and management of green spaces (topsoil spreading, lawn work, planting trees and shrubs, gravel strips). Additionally, it involves provisions for fence repair and creation.
4. Electrical Works (Heavy Currents - CFO): This segment focuses on the connection to the distribution network, including establishing connection requests, supplying and installing the main circuit breaker, installing cables between the metering panel and the main low-voltage switchboard (TGBT), and providing mandatory CONSUEL and/or RVRAT attestations for commissioning new metering and electrical installations.
5. Electrical Works (Light Currents - CFA): This encompasses several specialized systems. For operator adduction, it includes establishing connection requests, supplying and installing DTIo, installing optical cables, technical reception, labeling, and providing CONSUEL/RVRAT attestations. The VDI (Voice, Data, Image) infrastructure involves the installation of distributors, RJ45/RJ45 patch cords, grounding, RJ45 and HDMI sockets, type 1 workstations, and the reception of links and canalizations. The Fire Safety System (SSI) covers the installation of a Type 4 alarm panel, Type 1 and Type 2 manual triggers, sound and light diffusers, technical stops for comfort ventilation and sound systems, relighting of multi-activity rooms, AES, and includes programming, testing, commissioning, and canalizations. Lastly, the Access Control and Videophone system requires the installation of videophones, indoor units, gate opening/closing commands, call reception applications, programming, testing, commissioning, and canalizations.
Sources
- 1CCTP_Lot 07_etancheite.pdf — “à titre indicatif pour servir de base à la consultation des entreprises. Il appartient aux Entreprises soumissionnaires, de réaliser toutes les études complémentaires en phase d'appel d'offre, de manière à inclure, dans…”
- 2CCTP_Lot 10_menuiseries-int.pdf — “2026_Page 18/31 10.DESCRIPTION DES TRAVAUX Le Maître d'œuvre est missionné par le Maître d'Ouvrage pour une mission de base au sens du CCP (Code de la Commande Publique) sans études d'exécution. Les indications contenues…”
- 3CCTP_Lot 08_menuiseries-ext.pdf — “une mission de base au sens du CCP (Code de la Commande Publique) sans études d'exécution. Les indications contenues dans le CCTP du présent lot, ainsi que sur les plans sont contractuelles. Toutefois, tous les renseigne…”
- 4CCTP_Lot 09_platrerie-peinture.pdf — “leurs offres, toutes les sujétions nécessaires de réalisation et de parfait achèvement des ouvrages à traiter. 9.1. GÉNÉRALITÉS 9.1.1. Etudes d'exécution Réalisation des études d'exécution des ouvrages, comprenant: - les…”
- 5DPGF_Lot 14_CFO CFA.xlsx — “installations existantes et du lieu.,,,,, ,,,,Y compris toutes autres sujétions,,ens,,,0 ,,,,(à détailler par le candidat),,,,, ,,,,,,,,, ,,,,,Sous-total poste - Visite & état des lieux,,,,0 2,2,2,,Organisation des trava…”
- 6CCTP_Lot 01_desamiantage.pdf — “de son personnel. Compris toutes les sujétions jugées nécessaires par l'Entreprise pour mener à bien les travaux qui lui sont dus. Mode de métré: A l'ensemble. Localisation: Pour l'ensemble des études, plan de retrait et…”
- 7DPGF_Lot 03_infra-reseaux_terras.xlsx — “DE CHANTIER,,,, 3.2.1,Ouverture des grillages existants (pour mémoire),,,, 3.2.2,Voie d'accès et stockage chantier et remise en état,m²,340,,0 ,,,,, ,,,,Sous-Total GENERALITES - INSTALLATION DE CHANTIER €HT,0 ,,,,, 3.3,T…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 158 FILES
- DPGF_Lot 00_installation-prov-club.pdf190 KBPDF
- PC5.1-Pièce 4-Elevations Nord.pdf2.7 MBPDF
- CCTP_Lot 08_menuiseries-ext.pdf1.4 MBPDF
and 151 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.