TENDER DESCRIPTION
This tender seeks comprehensive planning services for the district heating network infrastructure in Bad Saulgau, specifically covering HOAI planning phases 5 through 9 for heat generation, technical equipment, and leading coordination with other trades. The scope includes detailed planning, tender preparation, contract award assistance, object supervision, and documentation for plant groups such as heat supply, air conditioning, heavy current, telecommunications, conveying, and building automation, while integrating decentralized heat sources like deep drilling and a robust process control system. Key technical requirements include a sophisticated process control system, crane systems, truck scales, various camera systems, redundant control stations, energy management, and hydraulically fed grate firing systems designed for heavy machinery with minimum 25% performance reserve for pumps and ventilators, ensuring system expandability for future network extensions. The project's core timeline extends from November 4, 2024, to May 7, 2029, with planning services being awarded between November 8, 2024, and May 8, 2025, and construction execution spanning from October 21, 2025, to…
TENDER BRIEF
Question: What is the contract timeline?
Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.
The contract timeline includes the following dates and key milestones:
Overall Project Timeline:
- Start Date: The earliest significant start date for a major phase is November 4, 2024, for the "Start - Bewilligungszeitraum Modul 2" (Start - Approval Period Module 2).
- End Date: The "Projektende" (Project End) is consistently stated as May 7, 2029. However, some activities, like "Vertriebsstart" (Sales Start), extend until June 1, 2032, and some "Förderjahr" activities until October 17, 2031.
- Total Duration: From November 4, 2024, to May 7, 2029, the core project duration is approximately 4 years and 6 months.
Key Milestones and Phases:
- Founding of the operating company (Gründung Betreibergesellschaft): November 7, 2024, to December 4, 2024.
- Approval Period Module 2 (Bewilligungszeitraum Modul 2):
- Start: November 4, 2024.
- End: August 2, 2029. Another approval period is from June 16, 2025, to June 15, 2029.
- Awarding of Planning Services LPH 5-8 or 9 (Ausschreibung und Vergabe der Planerleistungen LPH 5-8 bzw. 9): November 8, 2024, to May 8, 2025.
- Detailed Planning, Tender, and Award of Construction Services (Ausführungsplanung, Ausschreibung und Vergabe Bauleistungen): May 16, 2025, to October 9, 2025.
- Approval of Early Measures Start (Bewilligung vorzeitiger Maßnahmenbeginn): June 16, 2025.
- Receipt of Grant Notification (Eingang Zuwendungsbescheid): December 17, 2025.
- Awarding of Construction Services (Vergabe Leistungen zur Bauausführung): October 9, 2025.
- KickOff Heating Plant and Construction Section 1 (KickOff Heizzentrale und Bauabschnitt 1): October 21, 2025.
- Execution (LPH 8 - Ausführung): October 21, 2025, to February 28, 2029.
- First Heat Supply (Erste Wärmelieferung): September 1, 2026.
- Sales Start (Vertriebsstart): July 14, 2026, to June 1, 2032.
- Construction Section 1+2+3+4 (Bauabschnitt 1+2+3+4 Wärmenetz): October 12, 2026, to May 30, 2029.
- Construction Section 2 - Start of Operating Phase (Bauabschnitt 2 - Beginn Betriebsphase): August 6, 2027.
- Construction Section 3 - Start of Operating Phase (Bauabschnitt 3 - Beginn Betriebsphase): April 27, 2028.
- Construction Section 4 - Start of Operating Phase (Bauabschnitt 4 - Beginn Betriebsphase): December 1, 2028.
- Sales, Marketing, Public Relations (Vertrieb, Marketing, Öffentlichkeitsarbeit): November 4, 2024, to July 26, 2029.
- Project End (Projektende): May 7, 2029.
Sources
- 1Anhang_1_2025_02-SWBS-Planungsbericht+Update+Anhang.pdf — “Vergabe Leistungen zur Bauausführung 0 Tage 09.10.25 09.10.25 11 1.1.9 KickOff Heizzentrale und Bauabschnitt 1 0 Tage 21.10.25 21.10.25 12 1.1.10 Erste Wärmelieferung 0 Tage 01.09.26 01.09.26 13 1.1.11 Bauabschnitt 2 - B…”
- 2Anhang_7_20260417_Zeitplan_Akt. Endabzug.pdf — “06.05.26 SWBS 41 0% 47 2.2.4.2.5 Preisfestsetzung (Preisblätter) 20 Tage Mon 23.03.26 Die 21.04.26 SWBS 41 49;48 0% 48 2.2.4.2.6 Vorbereitung Vertrieb (siehe Notizen) 55 Tage Mit 22.04.26 Mon 13.07.26 SWBS 47 49 0% 49 2.…”
The core scope of work for this tender involves planning services for the district heating network infrastructure in Bad Saulgau, focusing on "Fachplanung Wärme, technische Anlagen, und Koordinierungsfunktion" (Lot 1). The project aims to expand the existing district heating networks using sustainable energy sources.
The Statement of Work covers HOAI (Honorarordnung für Architekten und Ingenieure) planning phases 5 through 9 for various technical equipment plant groups, building upon previously completed phases 2-4.
Core deliverables and activities include:
- Planning and implementation of phases 5-9 for heat generation and associated systems, such as air conditioning systems and heavy current systems.
- Planning of the heating center, requiring coordination with specialists for building/structural planning (Lot 3) and traffic (Lot 6), to ensure all necessary systems for efficient operation, including outdoor installations like truck scales, are considered.
- Development of a control system for the heating network and integration of additional decentralized heat generators and heat sources (e.g., deep drilling).
- Taking on a leading coordination role with other trades.
- Performing basic services for the preparation of contract awards (LPH 6), which includes determining quantities, preparing tender documents with service specifications and maintenance services, coordinating interfaces with other planning parties, calculating and controlling costs.
- Assisting in the contract award process (LPH 7), which encompasses obtaining, reviewing, and evaluating offers (including additional or changed services), conducting bidder discussions, comparing tender results with cost calculations, and preparing award proposals.
- Providing object supervision during construction (LPH 8) and documentation (LPH 9).
The specific plant groups involved are:
- Anlagengruppe 2: Heat supply systems.
- Anlagengruppe 3: Air conditioning systems.
- Anlagengruppe 4: Heavy current systems.
- Anlagengruppe 5: Telecommunications or information technology systems.
- Anlagengruppe 6: Conveying systems.
- Anlagengruppe 8: Building automation.
Sources
- 1260814_Leistungsbeschreibung_TGA.pdf — “auf folgende Unterlagen zum Projekt. Diese Unterlagen sind für die Leistungserbringung durch den Auftragnehmer maßgeblich und werden Vertragsbestandteile: • Anhang 1- Planungsbericht LPH 2-4 • Anhang 2 -Machbarkeitsstudi…”
- 2Anhang_7_20260417_Zeitplan_Akt. Endabzug.pdf — “b.) Ausschreibung, BA 1+2+3+4; c) 3. Stufe, Mitwirkung Vergabe: BA 1+2, LPH 7 Vergabeverfahren Bau BA 1 + BA 2 + BA 3 + BA 4 Erstellung Vergabeunterlagen, Vorbereitung Vergabe Teinahmewettbewerb Abgabe Erstangebot Prüfun…”
- 3260814_Honorarangebot.xlsx — “,,,, Grundleistungen nach Anlagengruppen,Leistungsphase gem. HOAI,Pauschalhonorar EUR/netto,Mehrwertsteuer EUR,Summe Technische Ausrüstung Anlagengruppe 2,5,,,0 Technische Ausrüstung Anlagengruppe 2,6,,,0 Technische Ausr…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 22 FILES
- Anhang_7_20260417_Zeitplan_Akt. Endabzug.pdf258 KBPDF
- 260814_Formblatt_Verhandlungsvorschlaege.docx92 KBDOCX
- 260814_Honorarangebot.xlsx15 KBXLSX
and 15 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.