    Progettazione e altri servizi di architettura e ingegneria e servizi tecnici

    Notice number: 00516259-2026

    🇮🇹 ItalyRegione Autonoma della SardegnaServices

    KEY INFORMATION

    Submission deadline
    Sep 10, 2026
    Location
    🇮🇹 Italy
    Contracting authority
    Regione Autonoma della Sardegna
    Accepted Languages
    Italian
    Tender type
    Services
    Contract Value
    Published date
    Jul 27, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive engineering and architecture services coupled with the execution of works for the requalification of the ex-Saline complex, designated for the transfer of Cagliari's historical archive. The scope includes Technical and Economic Feasibility Project preparation, Executive Project drafting, Work Direction, Safety Coordination, and extensive building envelope maintenance, structural restoration, and technological system renovations. Key technical requirements mandate the use of digital methodologies, including BIM, Project Management certification (UNI 11648:2022 or UNI ISO 21500), integration of Minimum Environmental Criteria (CAM), LCC analysis, and adherence to various legislative and regulatory standards such as D. Lgs. 36/2023, NTC 2018, and D. Lgs. 42/2004. Financially, bidders must demonstrate professional indemnity insurance coverage of €400,000.00 or a global turnover of €892,390.06 in engineering and architecture services over the best three of the last five preceding financial years. The contract involves an executive design and safety plan delivery within 90 days, a works execution period of 630 days, with a total intervention closure…

    TENDER BRIEF

    The contract timeline includes several phases and durations:

    • Executive design and safety and coordination plan delivery: 90 natural and consecutive days from the communication of the start of activities.
    • Works execution: 630 days. This is also the estimated duration for the safety coordination and works supervision service during execution.
    • Connected services (Cadastral practices, Usability and APE certification): 30 natural and consecutive days from the certificate of regular execution.
    • Contract conclusion: Not before the approval of the certificate of regular execution by the regional administration, which must be issued within 30 days from the completion date of the works.
    • Total duration for intervention closure: 1,150 days.

    Key milestones and phases with estimated durations are:

    • Redaction of the design address document: 15 days.
    • Expression of interest for design, safety, and works supervision: 15 days.
    • Procurement procedure for professional design assignment, D.L. measurement and accounting, safety coordination, and definitive award (if expression of interest is deserted): 60 days.
    • Technical-economic feasibility design: 30 days.
    • Executive design: 90 days.
    • Authorizations/legal clearances: 120 days.
    • Project validation and approval: 35 days.
    • Procurement procedure for works assignment and definitive award: 90 days.
    • Works contract and definitive delivery of works: 35 days.
    • Testing/Certificate of regular execution: 30 days.

    The effectiveness of the contract is subject to the accounting registration of the related expenditure commitment. There is no explicit fixed contract start date or end date stated as calendar dates in the provided documents.The contract timeline is defined by several phases and their durations, rather than explicit start and end dates.

    • Executive design and safety and coordination plan delivery: This phase must be completed within 90 natural and consecutive days from the written communication by the contracting authority to commence activities.
    • Works execution: The estimated duration for the execution of works is 630 days. This also corresponds to the estimated time for the safety coordination and works supervision service during the execution phase.
    • Connected services (Cadastral practices, Usability and APE certification): These services must be completed within 30 natural and consecutive days from the certificate of regular execution.
    • Contract conclusion: The assignment will conclude no earlier than the approval of the certificate of regular execution by the regional administration, which must be issued within 30 days from the date of completion of the works.
    • Total duration for intervention closure: The overall estimated time for the entire intervention, including all phases, is 1,150 days.

    Key milestones and their estimated durations are also provided in a procedural timetable:

    • Redaction of the design address document: 15 days.
    • Expression of interest for design, safety, and works supervision from employees: 15 days.
    • Preparation of invitation letter, procurement procedure for professional design assignment, D.L. measurement and accounting, safety coordination, and definitive award (if the expression of interest is deserted): 60 days.
    • Technical-economic feasibility design: 30 days.
    • Executive design: 90 days.
    • Authorizations/legal clearances (e.g., cultural interest, fire department, landscape, municipal usability): 120 days.
    • Project validation and approval: 35 days.
    • Preparation of invitation letter, procurement procedure for works assignment, and definitive award: 90 days.
    • Works contract and definitive delivery of works: 35 days.
    • Testing/Certificate of regular execution: 30 days.

    The effectiveness of the contract is conditional upon the accounting registration of the associated expenditure commitment. Specific calendar dates for the contract start and end are not explicitly stated in the provided documents.

    Sources

    • 1Allegato 2. Schema di contratto_signed.pdf — “progettazione esecutiva e piano di sicurezza e coordinamento dovrà essere consegnata all'Amministrazione regionale entro novanta giorni naturali e consecutivi dalla ricezione della comunicazione scritta della Stazione Ap…
    • 2allegato-1.-capitolato-sia-saline-rev-signed.pdf — “piano di sicurezza e coordinamento dovrà essere consegnata all'Amministrazione regionale entro novanta giorni naturali e consecutivi dalla ricezione della comunicazione scritta della Stazione Appaltante che disporrà l'in…
    • 3Allegato 4. DIP saline altri edifici_signed con piante (1).pdf — “| Giorni | 90 9 | Contratto d'appalto e consegna definitiva dei lavori | Giorni | 35 18 10 | Esecuzione lavori | Giorni | 630 11 | Collaudo/Certificato regolare esecuzione | Giorni | 30 | Totale / chiusura intervento | G…

    The core scope of work for this tender involves the assignment of engineering and architecture services, alongside the execution of works, for the requalification of the ex-Saline complex, which is intended for the transfer of the historical archive of Cagliari.

    The Statement of Work summary and core deliverables include:

    I. Engineering and Architecture Services:

    • Technical and Economic Feasibility Project (PFTE) preparation: This involves elaborating the project in accordance with D. Lgs. 36/2023 and Annex 1.7, evaluating alternative designs, identifying the optimal solution, and producing reports, plans, graphic elaborations, structural and plant calculations, cost estimation, and economic frameworks. Preliminary indications for fire prevention, safety plans, and maintenance plans are also required.
    • Executive Project drafting: This includes detailing architectural, structural, plant, and specialist works, providing graphic and descriptive elaborations, an estimated metric calculation, special tender specifications, a timeline, and safety documentation, ensuring compliance with technical, performance, and regulatory requirements.
    • Work Direction.
    • Safety Coordination during the execution phase.
    • Complementary technical activities: These activities support the project by obtaining necessary authorizations, verifying compliance with current regulations, evaluating costs, and assisting the Responsible for the Procedure (RUP) during the tender and work execution phases.
    • Technical inspection and survey requirements: Ensuring accurate and complete technical inspections, including geometric, plant, and structural data collection, photographic documentation, and identification of criticalities and potential risks. Surveys must be performed with appropriate instruments, ensuring metric precision and coherence with the site, and verifying consistency with previous documentation.
    • Preliminary regulatory analysis: Verifying applicable regulations (urban planning, safety, systems, environmental/landscape constraints, fire prevention, energy efficiency) and assessing necessary authorizations.
    • Quality of design: Ensuring the technical project conforms to contractual requirements, with clear graphic elaborations, congruent metric calculations, suitable technical solutions, and consistency between structural, architectural, and plant components.
    • Other services: These include a technical report on the condition of properties to be renovated, landscape reports, acoustic requirements reports, and energy diagnosis of existing buildings.

    II. Execution of Works:

    • Extraordinary maintenance of the building envelope.
    • Structural restoration works.
    • Adaptations and renovation of technological systems.
    • Implementation of safety measures.
    • Interventions to eliminate degradation, danger, or malfunction.
    • All necessary works to ensure the full functionality and safety of the properties.
    • Specific interventions: Research and elimination of water leaks, infiltrations, sewage, and related degradation, along with the restoration of drainage and wastewater disposal systems.
    • Compliance: All works must adhere to current regulations, including DM 37/2008, CEI, Law 13/89, and fire prevention standards.

    Sources

    • 1disciplinare-di-gara-signed.pdf — “recapitata nei modi sopra indicati al consorzio si intende validamente resa a tutte le consorziate. In caso di avvalimento, la comunicazione recapitata all'offerente nei modi sopra indicati si intende validamente resa a…
    • 2Allegato 4. DIP saline altri edifici_signed con piante (1).pdf — “esistente e della conformità edilizia, urbanistica e impiantistica. Sulla base di tali elementi, il progettista dovrà elaborare il Progetto di Fattibilità Tecnica ed Economica (PFTE) in conformità al D. Lgs. 36/2023 e al…
    • 3B. Schema di calcolo corrispettivi_signed (1).pdf — “i relativi Parametri > di incidenza, desunti dalla tavola Z-2 allegata alla vigente normativa come modificato dal D. Lgs. 36/2023 considerando che si tratta di affidamento di sola esecuzione delle opere. EDILIZIA - E.22…
    • 4B. Schema di calcolo corrispettivi_signed.pdf — “i relativi Parametri > di incidenza, desunti dalla tavola Z-2 allegata alla vigente normativa come modificato dal D. Lgs. 36/2023 considerando che si tratta di affidamento di sola esecuzione delle opere. EDILIZIA - E.22…
    • 5allegato-1.-capitolato-sia-saline-rev-signed.pdf — “fax); gli oneri di trasporto, attrezzature e strumenti, materiali di consumo e quant'altro necessario in funzione al tipo e numero delle indagini, prove, verifiche per l'espletamento dell'incarico; gli oneri assicurativi…
    • 6Allegato 3. Quadro esigenziale saline altri edifici_signed (1).pdf — “Ente. Ricerca ed eliminazione di perdite d'acqua, infiltrazioni, liquami e fenomeni di degrado correlati che compromettono la funzionalità dell'impianto. Ripristino sistemi di scarico e smaltimento acque reflue e meteori…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 17 FILES

    • allegato-1.-capitolato-sia-saline-rev-signed.pdf
    • Allegato B.2 - Dichiaraz. capacità economica_fatturato globale.docx
    • Allegato 3. Quadro esigenziale saline altri edifici_signed (1).pdf

    and 10 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders