Sistema de control domòtic KNX BMS per a l'edifici del BCIN
Notice number: 046-26
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇪🇸 Spain
- Contracting authority
- Reactivació Badalona, SA.
- Accepted Languages
- Spanish
- Tender type
- Contract Value
- Published date
- Jul 31, 2026
TENDER DESCRIPTION
This tender solicits a single contractor for the comprehensive supply, configuration, programming, integration, and training of a KNX Building Management System (BMS) and access control solution for the BCIN building. The core scope involves developing an implementation project, providing all necessary equipment, and configuring the KNX system with ETS, integrating DALI lighting, and connecting to existing access control systems, ensuring compatibility with DIN rail equipment and utilizing open protocols. The contractor will implement visualization and supervision for up to fifty doors, various lighting maneuvers, motorized curtains, and automatic doors, delivering a local BMS platform with intuitive graphical interface, user management, and remote access. The maximum contract execution period is sixty natural days from formalization, with specific milestones for project submission and material delivery, and includes a mandatory two-year guarantee period with one year of remote assistance. Financial standing requirements are not specified.
TENDER BRIEF
The contract timeline is as follows:
- Contract Start Date: The terms begin counting from the day stipulated in the award resolution or contract. The contract is perfected upon its formalization, which is a prerequisite for its execution. Formalization will take place within a maximum of fifteen (15) working days following the notification of the award to the bidding companies.
- Contract End Date: Not explicitly stated as a fixed date, but the total duration implies an end date 60 natural days after the formalization of the contract.
- Total Duration: The maximum execution period of the contract is sixty natural days, counted from the formalization of the contract.
- Key Milestones or Phases:
- Project Implementation Submission: The maximum period to present the implementation project is 20 working days, counted from the day after the formalization of the contract.
- Materials and Equipment Delivery: The maximum period for the delivery of all materials and equipment is 45 natural days, counted from the day after the delivery of the implementation project. This delivery period must be compatible with the overall maximum execution period of sixty natural days.
- Guarantee and Assistance: The project, equipment, accessories, licenses, programming, integrations, and works subject to the contract will have a minimum guarantee of two years from the definitive reception. This includes at least one year of remote assistance for consultations, diagnosis, and minor programming adjustments.
- Possible Extensions: The contract may be extended if foreseen in section D of the characteristics table.
Sources
- 1PCAPC-Plecs administratius 046-26.pdf — “(prevista a l’Annex A del present plec). Els lots en què es divideix, en el seu cas, la contractació es detallen a l’apartat B del quadre de característiques. El Codi CPV (Vocabulari Comú de Contractació) que correspon a…”
- 2PPT_Exp_046-26.pdf — “al personal designat per Reactivació Badalona, SA. 2.21. Termini d’execució El termini màxim d’execució serà de seixanta dies naturals comptats des de la formalització del contracte, llevat que el Plec de clàusules admin…”
- 3Annex_A_Quadre_caracteristiques_Exp_046-26 rw MS.pdf — “de l’endemà de la formalització del contracte Reducció oferta Punts De 18 a 20 dies hàbils 0 punts De 15 a 17 dies hàbils 4 punts De 12 a 14 dies hàbils 8 punts De 9 a 11 dies hàbils 12 punts 8 dies hàbils o menys 15 pun…”
- 4Annex_C_Oferta_economica_Exp_046-26.docx — “del contracte. Termini ofert de lliurament del projecte | Marcar opció | Puntuació De 18 a 20 dies hàbils | ☐ | 0 punts De 15 a 17 dies hàbils | ☐ | 4 punts De 12 a 14 dies hàbils | ☐ | 8 punts De 9 a 11 dies hàbils | ☐…”
The core scope of work for this tender is a mixed contract primarily involving the supply, configuration, programming, integration, and training for a building management system (BMS) and access control solution. The objective is to centralize responsibility for component compatibility, communication coverage, operation of fifty access points, software configuration, and BMS integration with a single contractor.
The Statement of Work summary and core deliverables include:
- Project Implementation: Developing and delivering a functional and technical implementation project that identifies all control points, signals, dependencies, field elements, network connections, and dimensioning criteria.
- Equipment Supply: Providing all necessary equipment, accessories, licenses, interfaces, gateways, auxiliary elements, and software as defined by the project, ensuring compatibility with DIN rail for panel equipment.
- Installation Guidelines: Furnishing instructions for assembly, connection, and wiring for the installer, detailing cable types, conductors, sections, functions, and labeling.
- System Configuration and Programming:
- Complete setup and programming of the KNX system using ETS and the BMS platform.
- Configuration, programming, and testing of DALI lighting integration for three meeting rooms.
- Integration setup with the existing access control system from the BMS side, using official or documented connectors, and coordination with the access control provider.
- Visualization and Supervision: Implementing visualization and technical supervision for up to fifty doors with smart locks, as well as integrated supervision of forty-eight independent ON/OFF lighting maneuvers, fourteen motorized curtains, five automatic doors, DALI lighting in three meeting rooms with six scenarios, and fifty doors of the access control system.
- BMS Platform: Providing a local BMS platform with a clear and intuitive graphical interface for reception, maintenance, and authorized users, including secure remote access.
- User Management: Creating user profiles with various access levels, at minimum for administration, maintenance, and reception operators.
- Display and Data Configuration: Configuring display screens, statuses, authorized commands, technical alarms, incidents, and available records.
- Documentation and Training: Setting up backups, delivering administration credentials, manuals, final documentation, configuration files, and offering training to designated personnel.
- Support and Coordination: Providing technical support, coordinating with Reactivació Badalona, SA's Technical Directorate, and assisting with system functional tests.
- Commissioning: Performing functional tests, commissioning the system, correcting incidents, training staff, and submitting all final documentation.
Works explicitly *not* included are the material execution of electrical power wiring, laying of bus cables (KNX, DALI, Ethernet), physical mounting of equipment in panels, panel power supply and protections, installation of uninterruptible power supply systems, or mechanical/internal modifications to automatic doors.
Sources
- 1Informe_motivacio_Exp_046-26.pdf — “existent, amb visualització i supervisió de fins a 50 portes o punts de control d’accessos, d’acord amb les dades disponibles a través de la interfície o connector corresponent. • Plataforma BMS local o equivalent, amb i…”
- 2PPT_Exp_046-26.pdf — “il·luminació de tres sales de reunions, amb una botonera KNX a cada sala amb sis escenaris. • Visualització i supervisió tècnica de fins a cinquanta portes amb bombi domòtic. • Plataforma BMS local, interfície de visuali…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 7 FILES
- Resolució aprovació expedient 046-26 signat.pdf233 KBPDF
- Informe_motivacio_Exp_046-26.pdf523 KBPDF
- PCAPC-Plecs administratius 046-26.pdf407 KBPDF
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.