    Site Energy Project Development Services

    Notice number: ocds-h6vhtk-06eb05

    🇬🇧 United KingdomThe pirbright instituteServices

    KEY INFORMATION

    Submission deadline
    Sep 28, 2026
    Location
    🇬🇧 United Kingdom
    Contracting authority
    The pirbright institute
    Accepted Languages
    English
    Tender type
    Services
    Contract Value
    Published date
    Aug 24, 2026

    TENDER DESCRIPTION

    This tender seeks a single supplier to deliver comprehensive energy project development services, encompassing four distinct work packages: an Energy Centre utilities, metering strategy, and energy analysis study; a detailed Chilled Water study; a Compressed Air study; and a Stage 1 (ISO50001) energy audit for specified office and storage areas. The core objective is to identify energy efficiency improvements, reduce operational costs, and enable future energy spend forecasting through thorough assessments of site utilities, BMS data analysis, and PME coverage, while prioritising the optimisation of existing plant and infrastructure. Prospective suppliers must demonstrate ISO50001 experience and meet financial standing requirements, including an annual turnover of at least twice the contract value and a minimum Creditsafe Credit Risk Score of 60. The contract is scheduled to commence in the week of November 2nd, 2026, with a 6-month term, targeting completion by April 30th, 2027, over a 27-week work package period.

    TENDER BRIEF

    The contract is anticipated to commence with a "Go Live" date in the week commencing 2nd November 2026. The initial contract term is for 6 months from this Go Live date. The completion date for the entire service is specified as 30th April 2027.

    Key milestones and phases include:

    • WP1: Energy Centre Utilities study
    • WP2: Chilled Water capacity/usage study
    • WP3: Compressed Air capacity/usage study
    • WP4: Metering Audit

    These work packages are planned to be completed over a period of 27 weeks. Additionally, the Consultant must submit a first program for acceptance within 3 weeks after the Contract Date, and a quality policy statement and quality plan also within 3 weeks after the Contract Date. Revised programs are to be submitted at intervals no longer than a month. A defects date is set for 26 weeks after the completion of the whole service.

    Sources

    • 1ITT Part 1 - Site Energy Project Development Services.docx — “Deadline. | 12:00 (Noon) on 28th September 2026 Completion of Tender Evaluation | 16th October 2026 Internal governance and sign off/ Acceptance Process / Contract Award Letter/ Unsuccessful Supplier letters | W/C 19th O…
    • 2ITT Part 2 - Appendix 1 - PSC4 Contract Data.docx — “and things access access date (1) | TBC | | (As and when required. Arrange with Pirbright Project Manager) (2) | | | (3) | | | The Consultant submits revised programmes at intervals no longer than | a month If the Client…

    The core scope of work for this tender is to deliver an energy assessment comprising four work packages. The primary objective is to identify opportunities for energy efficiency improvements, reduce operational costs, and help the site forecast energy use and plan energy spend accordingly. This involves walkthroughs of main site utilities (boilers, chillers, air-compressors, and motors) to identify energy performance gaps, report recommendations, and review the Building Management System (BMS) and submetering to establish energy sources and sinks, considering the impact of existing and new projects.

    The Statement of Work (SOW) is summarized by the following core deliverables and work packages:

    General Deliverables:

    • Improved visibility for future business case submissions driven by sustainability initiatives.
    • Final report and presentation to stakeholders.
    • Provision of future energy spend forecasting.
    • Identification of improvement strategies for existing energy management processes.
    • Detailed analysis of existing site invoice monitoring and management for gas and electricity.
    • Alignment of improvement strategies with site energy spend to understand benefits.
    • Provision of risk and action plan registers.
    • High-level audit for low-demand buildings to identify potential behavioral change plans and anticipated energy reduction.

    Work Packages:

    1. WP1: Energy Centre Utilities, Metering Strategy & Energy Analysis: This work package focuses on a steam, utility, and energy study within the Energy Centre (EC1) to enhance visibility of energy consumption, provide data for forecasting, and support sustainability initiatives.

    • Baseline Assessment: Obtaining billing data, half-hourly gas and electricity consumption data, benchmarking energy spend, establishing demand for EC1’s primary utilities (chillers, boilers, CHP, water), and developing an energy distribution map.
    • Metering Review & Analysis: Producing a comprehensive meter map for major EC1 utilities, reviewing existing BMS and PME coverage, assessing meter accuracy and performance, and recording issues in a risk register.
    • Improvement Strategy Development: Defining enhanced processes for meter verification, maintenance, and calibration, proposing improvements to BMS and PME metering strategy, and obtaining indicative budget costs for implementation.

    2. WP2: Chilled Water Study: This involves detailing existing chilled water generation plant and distribution systems, breaking down building user requirements (HVAC & process loads), and providing process flow diagrams. It includes analyzing chiller operation and chilled water distribution from BMS data and local weather trends. Solutions will be considered with a focus on optimizing existing plant and infrastructure, investigating plant condition, distribution network, hardware, control strategies, and performing financial analysis with carbon savings.

    3. WP3: Compressed Air Study: This entails detailing existing compressed air plant and distribution systems, outlining building user requirements, and mapping distribution. It includes analyzing energy data to baseline current demands, reviewing run time data against manufacturer performance, and observing equipment. Solutions will prioritize optimization, identify end-of-life or poor-performing equipment, evaluate hardware upgrades and control improvements, investigate centralization, and provide financial estimates including payback and carbon savings.

    4. WP4: Energy Audit Offices & Storage Areas: This involves a Stage 1 (ISO50001) energy audit of specific office and storage areas (Ash, Mod 1, Mod 2, Engineering Workshop, Philip Mellor Insectary (PMI), and ISO 9). The audit will identify low-level energy reduction initiatives, current energy behaviors, and recommend behavioral changes with estimated savings. Identified improvement measures will include CAPEX, OPEX, payback estimates, and an issue register for ongoing management.

    Sources

    • 1ITT Part 1 - Appendix A - Site Energy & Project Development Services Scope of Works.docx — “SCOPE OF WORKS Title: ITT Part 1 - Appendix A - Site Energy & Project Development Services Scope of Works Date: 24/078/26 Owner: David Gillies Client: The Pirbright Institute Contents Table of Contents 1 Specification Ou…
    • 2ITT Part 4 - Pricing Schedule - Final.xlsx — “sets to provide future energy spend forecasting,1,10,10,, ,Improved visibility for future business case submissions that are driven by sustainability initiatives,1,10,10,, ,Final report and presentation to stakeholders,1…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 7 FILES

    • ITT Part 1 - Appendix A - Site Energy & Project Development Services Scope of Works.docx
    • ITT Part 2 - Appendix 1 - PSC4 Contract Data.docx
    • ITT Part 3 - Site Energy Project Development Services.docx

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders