Stadtwerke Rosenheim - SCR Nachrüstung
Notice number: ocds-mnwr74-bdf4ca04-3e19-4547-bbf3-8cafef49c39e
KEY INFORMATION
- Submission deadline
- • Nov 12, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Stadtwerke Rosenheim GmbH & Co. KG
- Accepted Languages
- DEU
- Tender type
- Goods
- Contract Value
- Published date
- Oct 13, 2026
TENDER DESCRIPTION
This tender from Stadtwerke Rosenheim GmbH & Co. KG invites bids for the turnkey retrofit of a Selective Catalytic Reduction (SCR) system for their Gas Engine 4 (GM4) facility, ensuring compliance with 44. BImSchV emission requirements and enabling continued plant operation beyond 2028. The extensive scope of work encompasses engineering, planning, delivery, installation, assembly, commissioning, trial operation, operator training, and comprehensive documentation of the SCR system, including downstream oxidation or ammonia slip catalysts. Key technical specifications mandate emission limits such as NOx < 100 mg/Nm³ and NH3 < 5 mg/m³, an autonomously functioning SCR system that integrates with existing plant controls, and insulation compliant with DIN 4140 and AGI standards. Bidders are required to submit proof of a certified quality management system (DIN EN ISO 9001 or comparable), declarations of financial standing, including turnover for the past three years and professional liability insurance of €3,000,000 for personal injury and €1,000,000 for property and financial losses. The deadline for offer submission is November 12, 2026, with work anticipated to commence on June 1,…
TENDER BRIEF
The contract timeline includes the following key milestones and phases:
- Bid submission deadline: November 12, 2026, 10:00:00 Uhr.
- Bid binding period ends: December 23, 2026.
- Earliest possible start of work with motor interruption: June 1, 2027.
- Montage until warm commissioning: Between June 1, 2027, and July 23, 2027.
- Latest completion of warm commissioning with successful function test: July 23, 2027 (calendar week 29).
- Trial operation (Probebetrieb) with 72-hour performance test: Begins after successful warm commissioning, all function tests, parametrisation, and controller settings. This may occur in September or October 2027 due to weather conditions and heating load. A cumulative trial operation is possible.
- Acceptance (Abnahme): Formally occurs through the signing of a handover protocol after the successful completion of the trial operation.
- Start of the warranty period: Commences with the successfully documented end of the trial operation and acceptance.
The documents do not explicitly state a singular contract start date for the entire project (only for the earliest work start), an overall contract end date, or a total duration.
Sources
- 1261012_Anschreiben_Bewerbungsbedingungen.pdf — “bekannt gegebenen Zuschlagskriterien das wirtschaftlichste Angebot offeriert, wird der Zuschlag erteilt. Die Bieter, deren Angebote nicht berücksichtigt werden sollen, werden über den Namen des Bieters, dessen Angebot an…”
- 220261012_Vertragsbedingungen GM4 SCR-Nachrüstung.pdf — “der vereinbarten 2. Zahlungsrate (nach Anlieferung der Komponenten). Der Gefahrenübergang beschränkt im Rahmen eines Diebstahls und Beschädigung erfolgt nach Anlieferung und gemeinsamer Kontrolle des Lieferumfangs. Danac…”
- 3Anlage 1_Zusammenstellung Eingabedaten Ausschreibung GM4 SCR.xlsx — “Preiszusammenstellung,,, ,Pflichtfelder Angaben AN,, ,,, Preiszusammenstellung der Hauptkomponenten / Arbeiten,,, ,Stk,EP,Summe Katalysatorkammer,,,0 SCR Katalysator (Waben),,,0 SC (Oxi) Katalysator (Waben),,,0 Mischstre…”
- 420261012_Leistungsbeschreibung GM4 SCR-Nachrüstung.pdf — “jedoch beispielsweise aufgrund einer Blechkante ein Pfeifen und der Schallpegel überschreitet die genehmigten Grenzwerte, muss entsprechend nachgebessert werden. 2.8 Brandschutz / Brandschott Wand- und Deckendurchführung…”
The core scope of work and statement of work summary for this tender is the turnkey retrofit of a Selective Catalytic Reduction (SCR) system for Gas Engine 4 (GM4) located at Schönfeldstraße 15, 83022 Rosenheim. The overarching objective is to ensure compliance with legal framework conditions and emission requirements of 44 BlmSchV, enabling the continued operation of the plant beyond 2028, with all necessary exhaust gas aftertreatment components integrated into the existing gas engine building.
The core deliverables and scope of work include:
- Engineering & Planning: This involves surveying the existing exhaust gas path and site conditions, designing the SCR system (including catalyst volume, reactor geometry, dosing technology, injection, and mixing section), conducting flow simulations (CFD), and preparing layout plans and static/steel structure considerations.
- Delivery of Main Components: All components required for a fully operational, turnkey system are to be supplied. Key components include the SCR catalyst, SC catalyst, catalyst housing, mixing section, piping, insulation/damping, frame racks/brackets, a dosing system with a two-component nozzle, measurement technology, control system with an interface to the MHKW control system for data visualization and archiving, and the provision of fault messages. An optional 2000-liter intermediate tank with lines, control, and pump for filling is also part of the delivery scope.
- Montage and Installation: This encompasses the dismantling of existing components/piping as necessary, transport and installation of all delivered equipment, assembly of the complete SCR chamber, mixing section, piping, and accessories, complete insulation of new exhaust gas components and restoration of existing plant areas, special constructions for auxiliary structures, wall/ceiling penetrations (including core drilling and fire stops with documentation), and all necessary wiring. Compliance with the Water Resources Act (WHG) for urea components is required. Project coordination and management are also part of this phase.
- Commissioning: This stage includes functional testing of all components during warm commissioning (at partial and full load), parameterization of the control and regulation systems, a trial operation with a 72-hour performance test, and final acceptance/handover, which includes training for approximately 15 personnel over two shifts.
- Documentation: Comprehensive documentation, as specified in the contract terms, must be provided.
- Other Requirements: Adherence to occupational safety standards, specified noise requirements, and fire protection measures (including fire stops for wall and ceiling penetrations) are mandatory throughout the project.
Sources
- 120261012_Leistungsbeschreibung GM4 SCR-Nachrüstung.pdf — “GM4 SCR-Nachrüstung Leistungsbeschreibung stadtwerke rosenheim Kurzbeschreibung: Schlüsselfertige Nachrüstung einer SCR-Anlage im Bestand, an der Gasmotoranlage 4 (GM4) am Standort Schönfeldstraße 15, 83022 Rosenheim. Au…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 12 FILES
- Anlage 5_Fremdfirmenordnung.pdf2.0 MBPDF
- 261012_Eigenerklaerung_Russland.pdf258 KBPDF
- Anlage 3_Installationsplan (Ebene +2).pdf4.8 MBPDF
and 5 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.