TENDER DESCRIPTION
This tender solicits comprehensive services for the development of Plans Climat-Air-Énergie Territoriaux (PCAET) and their associated Évaluations Environnementales Stratégiques (EES) for municipalities across the Pieve de l'Ornano, Sartenais-Valinco-Taravo, Alta Rocca, Celavu-Prunelli, and Spelunca-Liamone community spaces. The scope encompasses all phases, from initial approach framing, territorial diagnosis including a Greenhouse Gas Emissions Report (BEGES) and AFOM analysis, strategy and action program development, to establishing a monitoring and evaluation system, and managing public and public persons consultation for adoption and submission. Key technical requirements demand a robust SIG production chain compatible with WebSIG vMap (Veremes), adherence to specific data standards such as PostgreSQL/PostGIS exploitability, RGF93/Lambert-93 projection (EPSG:2154), INSPIRE-compliant metadata, and OGC service publication (WMS/WFS). The contract is established as a framework agreement for one year, renewable up to three times for a maximum total duration of four years, with services commencing upon purchase order issuance and adhering to indicative study phase timelines.…
TENDER BRIEF
The contract timeline consists of an overall framework agreement duration and specific phases for the studies.
The framework agreement is concluded for a duration of one year starting from its notification date. It can be renewed three times for an additional year each, meaning the total duration cannot exceed four years. The renewal is tacit unless a non-renewal decision is explicitly notified two months before the annual deadline. The actual start of services for each study will commence from the date a purchase order is issued.
An indicative planning for the phases of the PCAET/EES (Plans Climat-Air-Énergie Territoriaux / Évaluation Environnementale Stratégique) includes:
- Phase 1 (Cadrage): M0 to M2 (2 months).
- Phase 2 (Diagnostic + BEGES): M2 to M8 (6 months for the diagnostic, conducted in parallel with the Environmental Impact Assessment (EIE)).
- Phase 3 (Stratégie): M8 to M12 (4 months).
- Phase 4 (Programme d'actions): M12 to M17 (5 months).
- Phase 5 (Suivi/évaluation): M16 to M18 (2 months).
- Consultations (AE, public, préfet): M18 to M25 (7 months).
The provided planning is indicative, and the actual duration cannot exceed the planned duration by more than 5%, both per phase and overall. Regulatory consultation delays (e.g., environmental authority, public participation, prefect's opinion) and delays caused by the contracting authority or third parties will extend the schedule and are not factored into this duration.
Sources
- 1AWS-MPI-1856280-RC.pdf — “délai d'exécution L'accord-cadre est conclu pour une durée d'un an à compter de sa notification. Il peut être reconduit trois fois pour une durée d'un an, sans que sa durée totale puisse excéder quatre ans. La reconducti…”
- 2AE acte d'engagement Lot 1 PCAET.docx — “code de la commande publique, exécutées par l’émission de bons de commande. ARTICLE 3 - DUREE DU MARCHE ET DELAIS D’EXECUTION 3.1 Durée du marché Le marché est conclu pour une durée d’un an à compter de sa notification.…”
- 3AE acte d'engagement Lot 2 EES.docx — “dispositions de l’article R 2112-6 du code de la commande publique, exécutées par l’émission de bons de commande. ARTICLE 3 - DUREE DU MARCHE ET DELAIS D’EXECUTION 3.1 Durée du marché Le marché est conclu pour une durée…”
- 4CCTP CAHIER DES CLAUSES TECHNIQUES PARTICULIERES .pdf — “3 Stratégie | 1 COTECH (visio) + 1 COPIL (présentiel) de validation du scénario Phases 4 & 5 - Actions et suivi | Ateliers territoriaux + 1 COTECH (visio) + 1 COPIL (présentiel) de validation EES (phases 4-5, 7-8) | 2 CO…”
- 5CCAP CAHIER DES CLAUSES ADMINISTRATIVES PARTICULIERES .pdf — “peut pas refuser la reconduction. 5 Syndicat d'Energie de la Corse du Sud - Cahier des Clauses Administratives Particulières Élaboration des PCAET/EES au bénéfice des communes regroupées dans les espaces communautaires d…”
The core scope of work for this tender involves two main lots for the benefit of communes grouped within the community spaces of Pieve de l'Ornano, Sartenais-Valinco-Taravo, Alta Rocca, Celavu-Prunelli, and Spelunca-Liamone.
Lot N°1: Elaboration des Plans Climat-Air-Énergie Territoriaux (PCAET)
This lot comprises six phases:
- Phase 1: Framing the approach (Cadrage de la démarche).
- Phase 2: Territorial diagnosis and Greenhouse Gas Emissions Report (Diagnostic territorial et BEGES), which includes an AFOM analysis of the diagnostic.
- Phase 3: Territorial strategy and objectives (Stratégie territoriale et objectifs), involving the proposal of three scenarios, validation by the steering committee (COPIL), and the definition of strategic and operational objectives (covering greenhouse gas reduction, carbon storage, energy consumption control, renewable energy production, pollutant reduction, network evolution, and adaptation).
- Phase 4: Action program (Programme d'actions), which focuses on developing a program to achieve the adopted strategy, including organizing and animating workshops and preparing detailed action sheets.
- Phase 5: Monitoring and evaluation system (Dispositif de suivi et d'évaluation), which involves proposing a monitoring method, defining indicators, and producing an environmental report.
- Phase 6: Consultation of Public Persons and the Public (Consultation des PPA et du public), including obtaining opinions from the Environmental Authority, public participation, and the prefect's opinion, followed by adoption and submission to ADEME.
Core Deliverables for PCAET (Lot 1):
- Non-technical summary of the PCAET.
- AFOM analysis of the diagnostic.
- Three proposed scenarios.
- Strategic and operational objectives.
- Validated global territorial strategy.
- Program of actions.
- Transition plan for the BEGES (R229-47 CE).
- Workshop supports and minutes.
- Detailed action sheets.
- Operational implementation calendar.
- Indicators and an environmental report.
Lot N°2: Elaboration des Évaluations Environnementales Stratégiques (EES)
This lot consists of eleven phases:
- Phase 1: Preliminary exchanges and evaluation method (Échanges préalables et méthode d'évaluation).
- Phase 2: Initial State of the Environment (État Initial de l'Environnement - EIE), based on various data sources such as DREAL, INPN, Carmen, Gest'eau, cartorisque, BASIAS, INSEE, OREGES, Qualitair Corse.
- Phase 3: Prior framing with the Environmental Authority (Cadrage préalable auprès de l'Autorité environnementale).
- Phase 4: Iterations and impact analysis (Itérations et analyse des incidences), including multi-criteria impact analysis and scenario planning.
- Phase 5: Residual impacts and Avoid-Reduce-Compensate (ERC) measures (Incidences résiduelles et mesures ERC).
- Phase 6: Natura 2000 impact assessment (Évaluation des incidences Natura 2000).
- Phase 7: Monitoring system and environmental indicators (Dispositif de suivi et indicateurs environnementaux).
- Phase 8: Drafting of the environmental report (Rédaction du rapport environnemental).
- Phase 9: Referral to the AE and response brief (Saisine de l'AE et mémoire en réponse).
- Phase 10: Public consultation file (Dossier de consultation du public).
- Phase 11: Environmental declaration (Déclaration environnementale).
Core Deliverables for EES (Lot 2):
- Environmental report (V0/V1/V2).
- Response brief to the AE's opinion.
- Draft environmental declaration.
- Cartography and SIG layers compatible with vMap.
Sources
- 1BPU lot 1 et lot 2.xlsx — “,,,,, ,,,,, ,,,,, ,,,,, ,,,,, ,MARCHES PUBLICS DE SERVICES,,,, ,,,,, ,BORDEREAU DES PRIX UNITAIRES (BPU),,,, ,,,,, ,"SYNDICAT D'ENERGIE DE LA CORSE DU SUD : ACCORD CADRE A BONS DE COMMANDE POUR L'ELABORATION DE PLANS CLI…”
- 2MPI1856280_AAPC.pdf — “l'OMC: Oui Division en lots: Oui Il est possible de soumettre des offres pour tous les lots Nombre maximal de lots pouvant être attribués à un soumissionnaire: 2 Quantité ou étendue Valeur estimée hors TVA: 2000 000,00 €…”
- 3CCTP CAHIER DES CLAUSES TECHNIQUES PARTICULIERES .pdf — “Corse du sud des GES, stockage carbone, maîtrise des consommations, production et consommation d'EnR, réseaux de chaleur, productions biosourcées, réduction des polluants, évolution des réseaux, adaptation), chiffrés et…”
- 4AWS-MPI-1856280-RC.pdf — “la qualité et des risques - planning détaillé par phase et par territoire, cohérent avec le jalonnement indicatif du CCTP; dispositif de contrôle qualité des livrables; identification et maîtrise des principaux risques (…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 10 FILES
- AE acte d'engagement Lot 2 EES.docx114 KBDOCX
- CCAP CAHIER DES CLAUSES ADMINISTRATIVES PARTICULIERES .pdf497 KBPDF
- AWS-MPI-1856280-RC.pdf610 KBPDF
and 3 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.