Published
Tekniska konsulttjänster inom mark-, gata- och VA-projekt
Notice number: 00555075-2026
KEY INFORMATION
- Submission deadline
- • Sep 9, 2026
- Location
- 🇸🇪 Sweden
- Contracting authority
- Ulricehamns kommun
- Accepted Languages
- Swedish
- Tender type
- Services
- Contract Value
- Published date
- Aug 11, 2026
TENDER DESCRIPTION
This procurement is for a framework agreement for technical consulting services in earthworks, street, and water/sewerage projects, encompassing roles such as construction supervisor, project manager, design manager, control officer, BAS-P/BAS-U, and environmental coordinator. The assignments will involve both new construction and reinvestment projects, varying in scope and project phase, including planning and implementation of ground, street, or VA projects, development of program/system/construction documents, and construction management during execution. Key technical requirements include the use of digital systems for coordinating design information, structured risk management methodologies for identification and follow-up, and the application of AB 04 or ABT 06 standard contract forms. No specific financial standing requirements or contract timelines have been specified for this tender.
TENDER BRIEF
null
The documents provided do not explicitly state a core scope of work or a high-level summary of the Statement of Work for this tender. The available information primarily describes the required experience and characteristics for reference assignments for roles such as Construction Manager (Byggledare), Design Manager (Projekteringsledare), and Project Manager (Projektledare).
For these reference assignments, tenderers are asked to provide a short but detailed description of the project's character, scope, challenges, and implementation. The qualification requirements for these reference projects include:
- Project Management (Projektledare): Planning and implementation of ground, street, or VA projects (e.g., street reconstruction, parking areas, pedestrian and bicycle paths, utility relocations). Also, new construction or reconstruction of infrastructure projects in urban or municipal environments (e.g., residential areas, school areas, public spaces).
- Design Management (Projekteringsledare): Development of program, system, or construction documents for ground, street, or VA projects (e.g., street reconstruction, stormwater management, utility networks). Also, management of assignments involving coordination between multiple technical areas (e.g., ground, VA, traffic, lighting, geotechnical engineering) within detailed planning areas or municipal facility environments. Design Managers are also expected to have actively participated in the development of tender documents and supported the client during procurement, including handling questions and clarifications during the tender period, and managing design information in digital systems.
- Construction Management (Byggledare): Coordination during the construction phase, follow-up of contractors, quality, time, and cost control, and ongoing reporting. This includes construction management or supervision during the execution of ground, street, or VA projects (e.g., utility relocations, street reconstruction, new pedestrian and bicycle paths, or park areas). Also, construction management or supervision for contracts in densely populated areas or adjacent to municipal infrastructure, involving coordination between multiple actors and contractors. Construction Managers are expected to have identified, handled, and followed up on deviations from documents, schedules, or planned execution, and actively participated in preparing and executing final inspections.
However, these details describe the *experience required* for the roles to be filled under the tender, rather than the explicit scope of work for *this specific tender*.
Sources
- 1Bilaga 9 - Referensmall Byggledare.docx — “beskrivning av uppdragets karaktär, omfattning, utmaningar och genomförande. Beskrivningen ska omfatta för hur det aktuella referensuppdraget uppfyller kravet för det referensuppdrag som markerats ovan: Svar: (fältet utv…”
- 2Bilaga 10 - Referensmall Projekteringsledare.docx — “För varje referensuppdrag, används ett separat dokument och döps antingen som referensuppdrag 1 + rollens namn eller referensuppdrag 2 + rollen namn. I fylld bilaga ska sedan bifogas sedan under rollens referensuppdrag i…”
- 3Bilaga 11 - Referensmall Projektledare.docx — “För varje referensuppdrag, används ett separat dokument och döps antingen som referensuppdrag 1 + rollens namn eller referensuppdrag 2 + rollen namn. I fylld bilaga ska sedan bifogas sedan under rollens referensuppdrag i…”
- 4Bilaga 7- CV-mall Projekteringsledare.docx — “| | | 6.Har haft aktivt deltagande i framtagande av förfrågningsunderlag och varit stöd till beställare vid entreprenadupphandling, inklusive hantering av frågor och förtydliganden under anbudstid. | | | | | 7.Har haft a…”
- 5Bilaga 2- CV-mall BAS-P.docx — “Varje persons CV ska skrivas i denna mall som är framtagen för denna upphandling. Bifoga ett CV för varje roll med märkning enligt anvisning i förfrågningsunderlaget. Svar på nedanstående uppgifter behövs för att kunna b…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 11 FILES
- Bilaga 3- CV-mall BAS-U.docx72 KBDOCX
- Bilaga 4- CV-mall Kontrollansvarig.docx63 KBDOCX
- Bilaga 1 - Sanningsförsäkran.pdf197 KBPDF
and 4 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.