    Transformationsplanung BEW Modul 1 für die Stadtwerke Schwerin - Teilleistung Los 4: Nutzung von Geothermie für die Stadtwerke Schwerin GmbH (SWS)

    Notice number: 00570567-2026

    🇩🇪 GermanyStadtwerke Schwerin GmbH (SWS)Services

    KEY INFORMATION

    Submission deadline
    Sep 17, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Stadtwerke Schwerin GmbH (SWS)
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 18, 2026

    TENDER DESCRIPTION

    This tender solicits an expert contractor for the preparation of a funding guideline-compliant report on the expanded utilization of deep and medium-deep geothermal energy at the Schwerin site, serving as a vital component of Stadtwerke Schwerin GmbH's transformation plan under the Federal Funding for Efficient Heating Networks Module 1. The core scope involves integrating existing client analyses with external data, performing calculations, and developing a coherent overall concept that includes comprehensive data compilation, rough cost estimates based on DIN 276 and VDI 2067, and assessment of electrical grid connection requirements and district heating network integration. Work is mandated to begin within two weeks of commissioning, with all documentation to be handed over no later than three months from the order date, under a confidentiality agreement active for three years and extending for an additional five years post-information receipt. Contractors must meet a minimum average annual turnover of 300,000 EUR over the past three years and be prepared to submit offers in German, utilizing tools such as Teamdrive and VMPConnector.

    TENDER BRIEF

    The contract timeline indicates that the processing of the work must begin no later than two weeks after commissioning and the handover of the necessary documents. The completion of the work and the handover of the documentation are to occur no later than 3 months after the order is placed. Key milestones and delivery dates will be defined during an initial kick-off meeting after commissioning. Furthermore, a confidentiality agreement associated with the project has an initial term of three years, which is aligned with the project's implementation period. The confidentiality provisions of this agreement will remain in effect for an additional five years after the last information or documents are received.

    Sources

    • 1Ausschreibung_Fachgutachten_Geothermie.pdf — “Datenaustauschformaten zur Weiterverarbeitung im Rahmen der Erstellung des finalen Transformationsplanes zu übergeben. 4 Vertragsbedingungen Die folgenden Bedingungen sind bei der Angebotserstellung zu berücksichtigen un…
    • 2VVB 634 - Besondere Vertragsbedingungen_2610211.pdf — “634 (Besondere Vertragsbedingungen - Liefer-/Dienstleistungen) Vergabenummer 2610211 Maßnahme Transformationsplanung BEW Modul 1 für die Stadtwerke Schwerin - Teilleistung Los 4: Nutzung von Geother- mie für die Stadtwer…
    • 3Muster_NDA.docx — “für Tochtergesellschaften der Vertragsparteien. Diese Geheimhaltungsvereinbarung gilt nicht, soweit diese Informationen oder Unterlagen nachweislich auf andere Weise ohne Zutun dem empfangenden Partner allgemein bekannt…

    The core scope of work for this tender involves the creation of a funding guideline-compliant expert opinion ("Fachgutachten") for the expanded utilization of deep and medium-deep geothermal energy at the Schwerin site. This expert opinion serves as a crucial component of the transformation plan for Stadtwerke Schwerin GmbH (SWS) under the Federal Funding for Efficient Heating Networks Module 1.

    The contractor is required to process and integrate existing client analyses and elaborations with additional data sources, expert information, and experience values, performing necessary calculations to form a coherent overall concept. The resulting geothermal expert opinion will be combined with other expert opinions by the client to finalize the transformation plan, and the contractor must participate, cooperate, and coordinate with a designated coordinating body.

    The specific tasks and deliverables are summarized as follows:

    • Review of existing documents: Analyzing client documents to gather essential data for subsequent planning.
    • Compilation of data basis: Assembling the foundational data for the expert opinion, covering aspects such as:
    • Geological situation and reservoir potential, including lesser-considered horizons within the city area.
    • Subsurface development options, including reservoir and drilling technologies.
    • Technical geothermal utilization concepts.
    • Thermal and electrical plant capacities and efficiencies.
    • Achievable heat quantities and associated operating energy requirements.
    • Available electrical grid connection capacities.
    • Creation of rough cost estimate:
    • Estimating investment costs for the complete geothermal system, incorporating electrical grid connection costs, and categorizing them into at least seven cost groups according to DIN 276.
    • Obtaining and providing guideline price offers to the client.
    • Estimating operating costs and consumption quantities in line with VDI 2067.
    • Establishing the basis for a cost function (EUR/MWth) by calculating costs for typical plant sizes.
    • Determining required electrical connection capacities for developed variants, assessing site-specific grid connection possibilities, and estimating costs for any necessary grid infrastructure upgrades or new connections.
    • Optimally considering costs for connecting large electrical consumers and integrating with the existing district heating network during site selection.
    • Documentation of results: Producing a comprehensive report detailing the expert opinion, including all relevant aspects, text, tables, and graphics, along with essential data, in common data exchange formats for further processing into the final transformation plan.

    Sources

    • 1Ausschreibung_Fachgutachten_Geothermie.pdf — “10 Darcy) und ist auf 150 $m^{3}/h$ Thermalwasser-Volumenstrom dimensioniert. Die hier ausgeschriebene Leistung umfasst die Erstellung eines förderrichtlinienkonformen Fachgutachtens zur erweiterten Nutzung der tiefen un…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 17 FILES

    • Zuschlagskriterien_2610211.pdf
    • 25-10-17_SWS Lieferantenkodex_unterzeichnet .pdf
    • Bewertungsmatrix Eignung_2610211.pdf

    and 10 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders