    Travaux d'aménagement, de mise en sécurité et sûreté des salles du trésor et de la réserve - Cathédrale de Chambéry

    Notice number: 26-71896

    🇫🇷 FranceDRAC Auvergne - Rhône AlpesWorks

    KEY INFORMATION

    Submission deadline
    Sep 22, 2026
    Location
    🇫🇷 France
    Contracting authority
    DRAC Auvergne - Rhône Alpes
    Accepted Languages
    French
    Tender type
    Works
    Contract Value
    Published date
    Jul 20, 2026

    TENDER DESCRIPTION

    This tender seeks a comprehensive contractor for the refurbishment, security, and safety works within the Treasury and Reserve Rooms of Chambéry Cathedral. The scope encompasses extensive general site operations, preparatory works, and specialized trade interventions including electrical, heating, low current systems (VDI, fire alarm, video surveillance, intrusion), carpentry, roofing, waterproofing, stained glass, joinery, ironwork, metalwork, locksmithing, and the installation of alabaster panels. Key technical requirements mandate numerous Qualibat certifications (e.g., 2194, 6593, 3194, 4393) or equivalents, adherence to specific technical standards (e.g., ISO 9001, NF C 15-100, various DTUs), and the use of specified materials and technologies such as Popadyn® Museart or equivalent, FluXor® FX-CA or equivalent, RFID, and museum-grade security glass. Proposers must provide global and activity-related turnover for the last three financial years and valid ten-year and professional civil liability insurance certificates. The project is estimated to have a total duration of 13 months, including a one-month preparatory period, with site preparation scheduled for February 2027 and…

    TENDER BRIEF

    The contract timeline is as follows:

    • Total Duration: The estimated total duration of the construction project, encompassing all lots, is 13 months, which includes a one-month preparatory period.
    • Contract Start Date: The contract for each lot becomes effective upon the notification date of the service order that initiates the preparatory phase.
    • Preparatory Period: There is a preparatory period of one month, commencing from the date the service order for this phase is notified to the respective lot holders.
    • Work Execution Deadlines: Specific start dates for the works and their respective execution deadlines will be communicated through a service order issued to the holder of each lot.
    • Key Milestones/Phases:
    • Site Preparation: February 2027.
    • On-site and Workshop Construction: March 2027 to March 2028.
    • Installation of scaffolding and site facilities.
    • Restoration and fitting out of the antechamber for the reserve: March to mid-May 2027.
    • A three-month pause for the acclimatization of the reserve room: mid-May to mid-August 2027.
    • Transfer of objects from the Treasury room to the reserve room: mid-August 2027.
    • Restoration and fitting out of the Treasury room: September 2027 to mid-March 2028.
    • Transfer of objects for exhibition from the reserve room to the Treasury room: February 2028.
    • Site Dismantling: March 2028.
    • Contract End Date: The contract concludes once all work services are fully executed and received, any reservations are lifted, the "DDOE" (Dossier des Ouvrages Exécutés) is provided, and the contractual guarantees period is completed.

    Sources

    • 1CCAP_M2026-03-CRMH-ARA_Travaux_Tresor_Chambery.pdf — “éventuelles, la fourniture du DDOE, et la date d'achèvement des garanties contractuelles. La durée estimative du chantier, tous lots confondus, est de 13 mois (dont 1 mois de préparation). 4.3.2. Reconduction Les lots du…
    • 2CCTP TCE_generalites.pdf — “Maçonnerie - Pierre de taille - Décor - Installations générales et échafaudages Lot $n^{\circ}02$ | Charpente - Couverture Lot $n^{\circ}03$ | Vitraux - Menuiserie - Ferronnerie Lot $n^{\circ}04$ | Agencement - Mobilier…

    The core scope of work and statement of work summary for this tender encompass a variety of construction, renovation, and installation activities across multiple lots. The key deliverables and areas of work include:

    General Site Operations and Preparatory Works:

    • Site cleaning, including end-of-site cleaning.
    • Waste and rubble removal, with evacuation to approved sorting centers, and overall waste management.
    • Adherence to regulatory requirements, such as bailiff's reports for premises, administrative authorizations, and submission of executed works documents with photographic evidence before, during, and after restoration.
    • Installation of site infrastructure, including site panels, perimeter fencing, interior palisades, guarantee floors, and establishing living area facilities like changing rooms, common rooms, sanitary facilities, independent electricity meters, floor protection, and room setup.
    • Provision of site utility connections, specifically electrical cables, distribution boxes, and supplementary lighting and sockets.
    • Planning, installation, and control of scaffolding and scaffolding complements.
    • Specific preparatory tasks such as consignments, neutralizations, dismantling existing installations, and maintaining installations in occupied areas.
    • Conducting verifications and measurements of existing earthing, cable conformity, TGBT (Main Low Voltage Distribution Board) conformity, safety lighting, and the fire safety system.
    • Execution of core drilling, perforations, and resealing works.
    • Provision of handling and craning services.
    • Delivery of training for the proper functioning of installed equipment.
    • Preparation and submission of As-Built Drawings (DOE).

    Specific Trade Works:

    • Electrical Works: Preliminary electrical tasks, defining installation origins, establishing earthing circuits, equipotential bonding, and protective conductors. This also covers the low voltage structure principle, electrical cabinet descriptions, general distribution, specific power supplies, fault reporting, equipment and lighting, local equipment, and exterior lighting (for optional tranches).
    • Electric Heating Works: General specifications, detailed work definitions, and contractor obligations for electric heating installations.
    • Low Current Works: Implementation of VDI (Voice, Data, Image) networks, fire alarm systems, video surveillance, and intrusion alarm systems.
    • Carpentry and Roofing: Floor reinforcement, including the dismantling and re-installation of flooring, removal of wooden joists, and the supply and installation of insulating material. New slate roofing, involving dismantling, installation of new slates and copper nails, replacement of eaves, and revision/replacement of sarking boards. Repositioning of lightning rod ribbons is also included.
    • Waterproofing and Rainwater Harvesting: Renovation of waterproofing elements and rainwater collection systems, encompassing the dismantling and replacement of chimney flashings, gutters, and downpipes, along with adapting existing downpipe connections.
    • Stained Glass Works: Taking gabarits and measurements, dismantling stained glass panels for workshop restoration, transportation, and re-installation. This also includes temporary enclosure of bays and general restoration of stained glass windows.
    • Joinery Works: Restoration of existing joinery components (windows, doors, interior shutters). Creation and installation of new window joinery featuring double glazing, UV filters, and hygrometric ventilation grilles, as well as new interior wooden shutters.
    • Ironwork, Metalwork, and Locksmithing: Creation and installation of ironwork elements, such as handrails. Metalwork includes the creation of covers for technical skirting. Locksmithing involves the restoration and supply/installation of new locksmith elements for entrance doors.
    • Alabaster Works: Installation of alabaster panels on steel frames with steel reinforcement in specific architectural openings, including fixation and peripheral/intermediate metal structures.

    All installations are required to have a two-year total warranty covering on-site services, labor, and travel. The tender also specifies the realization of tests, commissioning, and necessary training for the proper functioning of the installed material.

    Sources

    • 1LOT 01_DPGF_TF.xlsx — “évacuation des gravats en centre de tri agréé,Ens.,1,,0 ,2.3,RÈGLEMENTAIRES,,,, ,2.3.1,. Constat d'huissier d'état des lieux et des ouvrages,Ens.,1,,0 ,2.3.2,. Démarches / autorisations administratives (voirie),Ens.,1,,0…
    • 2LOT 03_DPGF_TF et TO.xlsx — “l'ensemble des fournitures, travaux, prestations, charges et coûts divers, éventuellement non listés dans le présent document mais nécessaires à la parfaite réalisation des ouvrages et prestations. Elle ne pourra en aucu…
    • 3LOT 05_DPGF_TF et TO.xlsx — “DE RÉSERVE,,,, ,- Suivant CCTP,ens,1,, ,,,,, ,Total 3.7.8,,,, ,,,,, ,TOTAL § 3.7 TRAVAUX DIVERS en € H.T.,,,, ,,,,, ,,,,, ,,,,, ,SALLE DU TRESOR - TRANCHE FERME,,,, ,RECAPITULATIF,,,, ,,,,, ,DESCRIPTIF DES TRAVAUX,,,, ,,…
    • 4LOT 02_DPGF_TF.xlsx — “après restauration)",Ens.,1,,0 ,,,,,, ,,TOTAL OUVRAGES DIVERS DE FONCTIONNEMENT DE CHANTIER,,,,0 ,,,,,, ,3,INSTALLATIONS DE CHANTIER ET ÉCHAFAUDAGES,,,, ,3.1,INSTALLATIONS PARTICULIÈRES DE CHANTIER ET COMPLÉMENTS D'ÉCHAF…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 33 FILES

    • Modele_Attestation_travailleurs_etrangers.docx
    • CCTP TCE_generalites.pdf
    • Cahier graphique_electricite-courant faible-SSI.pdf

    and 26 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders