    Travaux de réalisation d’installations photovoltaïques

    Notice number: 00538073-2026

    🇫🇷 FranceSipperecWorks

    KEY INFORMATION

    Submission deadline
    Sep 25, 2026
    Location
    🇫🇷 France
    Contracting authority
    Sipperec
    Accepted Languages
    French
    Tender type
    Works
    Contract Value
    Published date
    Aug 4, 2026

    TENDER DESCRIPTION

    This framework agreement encompasses the realization of photovoltaic installations on properties owned by local authorities within the territory of Sipperec, including the supply, transport, and installation of PV modules, secondary support structures (e.g., K2 Dôme 6 classic or equivalent), and comprehensive electrical equipment, complete with a 20-year inverter warranty. A key technical requirement is the provision and commissioning of a production monitoring system, such as Webdynsun PM, compatible with the Epices-Energie platform, featuring a natively internet-connected datalogger (SIM/Ethernet/Wifi) capable of multiple daily data transfers to an FTP server, while explicitly prohibiting API-dependent systems for Epices Energie compatibility. Modules and mounting systems must possess ATEC or ETN validation, and bidders are encouraged to propose materials from reuse channels. The framework agreement has a maximum duration of four years (1+3 renewals), with subsequent contracts extending until the perfect completion guarantee. Financial requirements include submitting declarations of annual turnover, valid professional civil liability insurance, and valid ten-year guarantee…

    TENDER BRIEF

    The contract has a total duration of 1 year, renewable 3 times, for a maximum of 4 years.

    The duration of subsequent contracts (markets subséquents) runs from their notification until the end of the year of perfect completion guarantee. These subsequent contracts, concluded during the framework agreement's validity period, can be executed beyond its term, up to their specified end date.

    Key milestones and phases mentioned include:

    • Following the site visit, companies have a minimum of fourteen (14) calendar days to submit their offer.
    • After the award of a subsequent works contract, the contractor must provide their execution studies within 21 calendar days.
    • At the end of the work period, the project contractor must have completed the lifting of reservations issued by the control office, the application for a Consuel Certificate, and the parameterization.
    • The specific work schedule for each project will be provided by the project management in each consultation document (DCE).

    Explicit contract start and end dates are not stated, only the total maximum duration of the framework agreement.

    Sources

    • 126S029 - Convention accord-cadre.pdf — “de réalisation d'installations photovoltaïques Convention d'accord-cadre 3 Préambule La présente convention d'accord-cadre définit les termes régissant les marchés publics qui seront conclus sur la base de l'accord-cadre…
    • 226S029 - CCTP.pdf — “jours calendaires. La visite des sites sera obligatoire pour la réponse aux différents marchés subséquents. Le dossier de consultation des entreprises (DCE) sera envoyé aux entreprises lors de cette première prise de con…

    The core scope of work for this tender involves the realization of photovoltaic installations. The high-level summary of the Statement of Work (SOW) and core deliverables includes:

    • Photovoltaic Modules and Support Structures:
    • Supply, transport, and installation of photovoltaic modules on the roof.
    • Supply, transport, and lifting of the secondary support structure (chassis, rails, brackets, protective membranes) for the modules, including necessary accessories for PV plant ballasting.
    • Installation of the secondary structure, photovoltaic modules, and fixing accessories.
    • Electrical Equipment, Connections, and Protections:
    • Supply and installation of DC 6mm² cables for panel string wiring.
    • Supply of all necessary components for AC-side installation protection, including an AC cabinet fixed to a wall, potential arrangements for their placement, and mechanical protection for the equipment.
    • Supply and installation of cable trays (cablofil 100mm, covered, and installed on bigfoot supports) for AC and DC connections.
    • Installation and electrical connection of electrical equipment.
    • Equipotential bonding of grounds ("building ground connection") using a bare copper braid 6mm² across the entire installation.
    • Supply, installation, and connection of the inverter, including necessary accessories (mounting chassis, protective cover).
    • Extension of the inverter's warranty for 20 years.
    • Supply and installation of AC cable between the electrical cabinet at the inverter output and the main low voltage switchboard (TGBT) in a false ceiling within an existing cable tray.
    • Supply and installation of a differential switch in the TGBT for connecting the installation to the school's network.
    • Regulatory signage on the entire installation.
    • Provision and installation of DC and AC cabinets.
    • Provision and installation of all cable routes.
    • Provision and installation of the connection cable from the AC cabinet to the protected outlet in the site's TGBT, including any associated civil engineering works.
    • Monitoring System and Pedagogical Display:
    • Supply, installation in the AC cabinet, commissioning, and configuration of the production monitoring system (Webdynsun PM compatible with Epices-Energie platform).
    • Supply and installation of a pedagogical display screen with its remote support.
    • Provision, installation, and commissioning of the monitoring system and the pedagogical display system.
    • Project Management and Deliverables:
    • Provision of documents specified in the CCTP (before work commencement and during acceptance phase).
    • Marking of work zones and site protection measures.
    • Attendance at site meetings, commissioning of the installation, and initial and final electrical measurements (self-checks).
    • Obtaining a Consuel certificate.
    • Site cleaning and waste management.
    • Installation of the construction site.
    • Delivery to site and on the roof of all equipment related to the photovoltaic installation.
    • Protection against corrosion of all metallic structures installed by the contractor.
    • Earthing interconnection of all installation elements (modules, fixing system, electrical cabinets, etc.) to the site's main earth collector.
    • Electrical connection of photovoltaic modules up to the point of delivery.
    • All connections, commissioning, and guarantees.
    • Obtaining the certificate of conformity endorsed by CONSUEL, including the preliminary technical control mission.
    • Specific signage for photovoltaic installations and emergency services.
    • Identification and labeling of cables, junction boxes, electrical cabinets, and inverters (UV and weather resistant).
    • All scaffolding or aerial work platforms necessary for the execution of these works.
    • Sorting and disposal of waste.
    • Cleaning of equipment and site, removal of installations at the end of the project.
    • Provision of an as-built dossier (DOE).
    • A complete execution study file to be submitted to the project management and the designated technical controller.

    Sources

    • 126S029 - Cas d'étude DPGF.xlsx — “,,,,,, LE CANDIDAT REMPLIRA LES CASES JAUNES,,,,,, DPGF,,,,,, Nom de l'Entreprise Titulaire ou du groupement : ,,,,,, Installation photovoltaïque sur un groupe scolaire type,,,,,, "Projet : 41 kWc en toiture, Autoconsomm…
    • 226S029 - CCTP.pdf — “la base d'une étude préalablement réalisée par la maitrise d'œuvre associée au projet, le maitre d'ouvrage prévoira obligatoirement une visite du site et fournira aux titulaires de l'accord cadre un dossier de consultati…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 8 FILES

    • 26S029 - CCTP.pdf
    • 26S029 - QUESTIONS REPONSES.pdf
    • 26S029 - RC.pdf

    and 1 other document

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders