    TENDER DESCRIPTION

    This tender invites proposals for comprehensive drywall works essential to the basic renovation of Building 15/16, encompassing general site setup, installation of approximately 2,000 sqm of non-load-bearing partition walls, 100m of knee walls, 100 facing walls, shaft and fire walls (approx. 25 sqm), and associated door openings and aprons. The scope further includes the installation of freestanding ceilings (approx. 2,400 sqm), acoustic panel systems, inspection flaps, and fire protection cladding for steel columns and beams, alongside the provision of two mobile soundproof partition walls. Technical specifications mandate plasterboard surfaces meeting quality level Q2 (Merkblatt Nr. 2), non-load-bearing walls complying with DIN 4103-1, and sub-constructions utilizing galvanized steel sheet profiles according to DIN 18182-1, with all building materials conforming to European and German chemical laws. Furthermore, doors must have a clear passage width of at least 80cm, feature RAL 7035 door frames, Brillux Scala 78.06.18 corridor-side paint, and integrate Simons Voss transponder locking systems. The contract period extends from September 18, 2025, to January 18, 2028,…

    TENDER BRIEF

    The contract timeline for "Terminplan GBK 15-16 Planung der Planung LP8, INDEX E" has a start date of Thursday, September 18, 2025, and an end date of Tuesday, January 18, 2028. The total duration for this project is 576 days.

    A key milestone identified is "MEILENSTEIN LP8: Baubeginn Hauptarbeiten" (Start of main construction work), scheduled for Monday, December 1, 2025.

    Other phases and their durations include:

    • Baustellenvorbereitung (Construction site preparation): 50 days, from Thursday, September 18, 2025, to Friday, November 28, 2025.
    • Abbruch und Schadstoffsanierung GBK15/15a (Demolition and pollutant remediation GBK15/15a): 98 days, from Monday, December 1, 2025, to Monday, May 4, 2026.
    • Abbruch und Schadstoffsanierung GBK16/16a (Demolition and pollutant remediation GBK16/16a): 95 days, from Monday, January 19, 2026, to Friday, June 5, 2026.
    • Gerüst GBK15+GBK16 (Scaffolding GBK15+GBK16): 221 days, from Monday, June 15, 2026, to Friday, April 30, 2027.
    • Stahltragwerk GBK15 + GBK16 + GBK16a (Steel structure GBK15 + GBK16 + GBK16a): 75 days, from Monday, June 29, 2026, to Friday, October 9, 2026. This phase includes a milestone for when the steel structure stands on Friday, October 9, 2026.
    • Rohbau GBK15 (Shell construction GBK15): 125 days, from Friday, July 10, 2026, to Monday, January 11, 2027.
    • Rohbau GBK16 (Shell construction GBK16): 151 days, from Friday, July 10, 2026, to Tuesday, February 16, 2027.
    • Rohbau Flachbauten (Shell construction flat buildings): 173 days, from Thursday, July 23, 2026, to Friday, April 2, 2027.
    • Fassade GBK 15 (Facade GBK 15): 38 days, from Monday, June 22, 2026, to Wednesday, August 12, 2026.
    • Fassade GBK 16 (Facade GBK 16): 38 days, from Thursday, August 13, 2026, to Monday, October 5, 2026.
    • Schrägdach GBK 15 (Sloping roof GBK 15): 33 days, from Monday, September 28, 2026, to Wednesday, November 18, 2026.
    • Schrägdach GBK 16 (Sloping roof GBK 16): 38 days, from Thursday, October 29, 2026, to Tuesday, December 21, 2026.
    • Flachdächer (Flat roofs): 24 days, from Monday, April 5, 2027, to Friday, May 7, 2027.
    • Innenausbau GBK15 Spitzboden (Interior fit-out GBK15 attic): 10 days, from Wednesday, October 28, 2026, to Tuesday, November 10, 2026.
    • Innenausbau GBK 15 DG (Interior fit-out GBK 15 DG): 111 days, from Wednesday, October 28, 2026, to Tuesday, April 13, 2027.
    • Innenausbau GBK 15 OG (Interior fit-out GBK 15 OG): 111 days, from Thursday, November 26, 2026, to Thursday, May 13, 2027.
    • Innenausbau GBK15 EG (Interior fit-out GBK15 EG): 111 days, starting Friday, November 13, 2026.
    • Innenausbau GBK 15 UG (Interior fit-out GBK 15 UG): 44 days, from Thursday, March 11, 2027, to Friday, May 14, 2027.
    • Innenausbau GBK16 Spitzboden (Interior fit-out GBK16 attic): 10 days, from Friday, March 5, 2027, to Thursday, March 18, 2027.
    • Innenausbau GBK 16 DG (Interior fit-out GBK 16 DG): 89 days, from Friday, March 5, 2027, to Tuesday, July 13, 2027.
    • Innenausbau GBK 16 OG (Interior fit-out GBK 16 OG): 97 days, from Tuesday, March 23, 2027, to Tuesday, August 10, 2027.
    • Innenausbau GBK16 EG (Interior fit-out GBK16 EG): 106 days, from Monday, April 12, 2027, to Wednesday, September 8, 2027.
    • Innenausbau GBK 16 UG (Interior fit-out GBK 16 UG): 44 days, from Friday, June 11, 2027, to Wednesday, August 11, 2027.
    • Erdarbeiten GBK15-16 (Earthworks GBK15-16): 95 days, from Monday, July 12, 2027, to Friday, November 19, 2027.
    • Außenanlagen GBK15+16 (Outdoor facilities GBK15+16): 44 days, from Thursday, August 19, 2027, to Tuesday, October 19, 2027.
    • Übergabe (Handover): The final handover is scheduled for Wednesday, January 18, 2028.

    Sources

    • 1260624_GBK_15+16_Bauzeitenplan_detailliert_3xA0_Hochformat_Index-E.pdf — “Nr. Vorgang Vorgangsname Dauer Anfang Ende 1 Terminplan GBK 15‐16 Planung der Planung LP8, INDEX E, 24.06.26 576 Tage Don 18.09.25 Die 18.01.28 2 LP8 Objektüberwachung Bauausführung (Leistungsstufe 4) 576 Tage Don 18.09.…
    • 2260624_GBK_15+16_Bauzeitenplan_Übersicht_A2_Querformat_Index-E.pdf — “Vorgang Vorgangana Terminplan GBK 15-16 Planung der Planung LPS, INDEX E 18.06.26 LPS Objektüberwachung Bauausführung (Leistungsstufe 4) Clauer Antang Die 18.09.25 18.01.28 576 Tage Don 576 Tage Don Die 18.09.25 18.01.28…

    The core scope of work for this tender primarily involves drywall (Trockenbauarbeiten) for the basic renovation of Building 15/16 ("GBK, Grundsanierung Gebäude 15/16").

    The key areas of work include:

    • General tasks ("Allgemeines"): This covers overall site setup, maintenance throughout the construction period, and clearing the site, including provision and removal of material/crew containers, necessary equipment, tools, scaffolding, transport, lifting devices, and debris chutes.
    • Walls in Building 15 ("Wände Haus 15") and Building 16 ("Wände Haus 16"): This involves installing non-load-bearing internal partition walls (e.g., types IWGK-01, IWGK-18) that meet specific sound insulation and fire resistance requirements, with detailed specifications for construction materials and methods.
    • Ceilings in Building 15 ("Decken Haus 15") and Building 16 ("Decken Haus 16"): This includes the installation of acoustic ceiling systems with specified sound absorption grades (e.g., aw=0.90) and material characteristics, as well as the creation of dry construction aprons ("Trockenbauschürze") for ceiling offsets and as free wall ends.
    • Fire protection for steel structures ("Brandschutz Stahlkonstruktion").
    • Built-in elements ("Einbauten"): This encompasses tasks such as creating round openings/recesses in plasterboard for various installations like lights or disc valves.

    The statement of work summary for deliverables ("Dokumentation") includes a comprehensive set of documents:

    • A list of all installed materials, products, and building elements.
    • Disposal records, delivery notes, and data sheets.
    • Material quality certificates, acceptance test certificates (according to DIN EN), individual approvals, and general building inspectorate approvals for safety-relevant installations, such as fire protection measures.
    • Installer certificates, declarations of conformity, and performance declarations.
    • Test and acceptance protocols, own planning documents, specialist contractor declarations, specialist construction manager declarations, and care/maintenance instructions.

    The documentation must be provided digitally on two USB sticks containing PDF files of the entire folder content. Additionally, for maintenance-relevant facilities, two hard copies of the documentation are required. All documentation is to be submitted upon completion of the work, or at the latest, during acceptance.

    Sources

    • 126 E 0221 LV.pdf — “und Bauteile durch Zusammenstellung von: Auflistung aller eingebauter Materialien, Produkte, Bau-Elemente - Entsorgungsnachweise - Lieferscheine Datenblätter | | | - Für sicherheitstechnische Einrichtungen (wie Maßnahmen…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 137 FILES

    • A.A.0020.D.IA.313.- Nasszelle Barrierefrei.pdf
    • Merkblatt Schadstoffe in Baumaterialien Hochbau.pdf
    • A.A.0010.D.S.357.- Anschluss Badheizko╠êrper.pdf

    and 130 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders