    Umbau und Sanierung der Grundschule Wegscheid mit Schaffung von Ganztagesplätzen

    Notice number: 00548949-2026

    🇩🇪 GermanyMarkt WegscheidServices

    KEY INFORMATION

    Submission deadline
    Sep 7, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Markt Wegscheid
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 7, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive planning services for the conversion and renovation of Wegscheid Primary School, encompassing the creation of all-day care facilities and a hot food serving kitchen. The scope of work specifically covers Electrical Engineering (ELT), Equipment Group 4-5, and Service Phases 3-9 (Leistungsphasen 3-9) of HOAI, including Basic Evaluation, Preliminary Planning, and Design Planning, while explicitly excluding Execution Planning, preparation and participation in award procedures, and construction supervision for certain stages. Key technical requirements mandate the use of file formats such as docx, xlsx, pdf, dwg, and dxf, along with adherence to standards like DIN 276:2018-12, DIN 1988, TRGI, and TRF, and general compliance with applicable technical standards. Bidders must demonstrate financial standing through professional indemnity insurance with coverage of at least 3.0 million € for personal damages and 1.5 million € for other damages, available twofold annually, and provide net turnover data for comparable services from 2023-2025. A critical timeline constraint requires the completion of Leistungsphase 8 for the full-day areas by December 31, 2029.

    TENDER BRIEF

    The contract timeline includes several performance phases (Leistungsphasen) and a specific milestone for one of these phases. The identified phases are:

    • Leistungsphase 1 (Grundlagenermittlung)
    • Leistungsphase 2 (Vorplanung)
    • Leistungsphase 3 (Entwurfsplanung)
    • Leistungsphase 4 (Genehmigungsplanung)
    • Leistungsphase 5 (Ausführungsplanung)
    • Leistungsphase 6 (Vorbereitung der Vergabe)
    • Leistungsphase 7 (Mitwirkung bei der Vergabe)
    • Leistungsphase 8 (Objektüberwachung, Bauüberwachung und Dokumentation)
    • Leistungsphase 9 (Objektbetreuung)

    A key milestone is the completion of Leistungsphase 8 for the full-day areas, which is set for December 31, 2029. The document also refers to "Baubeginn," "Fertigstellungstermin," and "Nutzungsbeginn" as "siehe § 8.5," which points to the same LPH 8 completion date.

    The documents do not explicitly state a contract start date, an overall contract end date, or the total duration of the entire contract.

    Sources

    • 1Vertragsentwurf.pdf — “| | Leistungsphase 2: | | Leistungsphase 3: ☐ Ermitteln und Zusammenstellen der Baunutzungskosten Mitwirken bei der Beschaffung und Abrechnung von Fördermitteln (über alle LPH) | | Leistungsphase 4: | | Leistungsphase 5:…

    The core scope of work for this tender involves the renovation and refurbishment of the Wegscheid elementary school, including the creation of full-day care places. The planning services required fall under § 53 ff HOAI in conjunction with Annex 15 HOAI, specifically covering Electrical Engineering (ELT), Equipment Group 4-5, and Service Phases (Leistungsphasen - LPH) 3-9.

    A high-level summary of the Statement of Work and core deliverables includes the following phases and key tasks:

    1. Grundlagenermittlung (Basic Evaluation): This phase focuses on clarifying all planning and organizational framework conditions for the project. Tasks include clarifying the overall task based on client specifications (e.g., cost specifications, scope of facilities, utilization requirements, energy demand), determining planning boundary conditions, advising on service requirements and technical development, and summarizing, explaining, and documenting these initial findings in a comprehensive written form for the client.

    2. Vorplanung (Preliminary Planning / Project and Planning Preparation): The goal here is to develop a planning concept in its essential parts and provide a rough estimate of the total costs. This involves analyzing and processing the foundational information from the previous phase, coordinating services with other planning participants, developing the planning concept by pre-dimensioning systems and main plant components, exploring alternative solutions with an economic pre-assessment, and graphically representing the design (at least 1:200 scale). Results of this preliminary planning are to be thoroughly explained and discussed with the client.

    3. Entwurfsplanung (Design Planning / System and Integration Planning): This phase entails developing a technically and economically sound design that is capable of approval, along with calculating the overall costs. Key activities include elaborating the planning concept to a complete design, defining all systems and plant components, calculating, dimensioning, graphically representing (at least 1:100 scale), and describing the technical systems. It also involves estimating annual demand values (such as energy needs) and operating costs, coordinating space requirements for technical installations, updating functional and schematic diagrams, listing systems with technical data for energy balancing, and providing detailed descriptions of systems including usage conditions. Calculation results must be submitted to other planning participants for necessary verifications, and information for structural planning regarding penetrations and load data must be specified and coordinated.

    Planning and Supervision Goals are established in close coordination with the client during a goal-setting phase, covering aspects such as:

    • Quantities: To be defined based on existing preliminary planning and client coordination.
    • Qualities: Material specifications and other quality aspects are determined according to preliminary planning and client coordination.
    • Design: Including construction methods and special installation types, based on preliminary planning and client coordination.
    • Function: Goals regarding flexible use and expansion possibilities, in line with preliminary planning and client coordination.
    • Technical aspects: Such as heating methods or classification of ventilation system purity, based on preliminary planning and client coordination.
    • Economic aspects: A binding cost ceiling for the entire construction project, covering cost groups 200 to 700 (DIN 276:2018-12), must not be exceeded.

    Explicitly stated services that will *not* be commissioned include "Ausführungsplanung (Execution planning), Vorbereitung der Vergabe (preparation for award) and Mitwirkung bei der Vergabe (participation in award procedures)" for "Stufe 3" and "Bauüberwachung und Dokumentation sowie Objektbetreuung (Construction supervision and documentation as well as facility management)" for "Stufe 4".

    Sources

    • 1Beiblatt B Referenzliste.xlsx — “GWB §§ 123,124",,,,True,False,False,False,False,False,False,False,False,False,False,False,False,False,False,False ,je ARGE-Mitglied vorliegend,,,,False,False,False,False,False,False,False,False,False,False,False,False,Fa…
    • 2Vertragsentwurf.pdf — “dar. Der Auftragnehmer schuldet Folgendes: 1. Grundlagenermittlung Verantwortliches Klären aller planerischen und organisatorischen Rahmenbedingungen für eine sachgerechte Lösung der Gesamtaufgabe in folgenden Arbeitssch…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 21 FILES

    • 3 UNTERGESCHOSS.pdf
    • Beiblatt C.docx
    • Vertragsentwurf.pdf

    and 14 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders