Umbau und Sanierung der Grundschule Wegscheid mit Schaffung von Ganztagesplätzen
Notice number: 00547394-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Markt Wegscheid
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 7, 2026
TENDER DESCRIPTION
This tender seeks comprehensive architectural and engineering services for the conversion and renovation of Wegscheid Primary School, including the creation of full-day facilities and the planning of a hot food serving kitchen. The scope of work encompasses basic evaluation, preliminary design, draft design, preparation of tender documents, and assistance in awarding contracts, structured across staged commissioning. Adherence to VOB Teile A-C, HAV-KOM Abschnitt F, VOB/B, and DIN 276:2018-12 standards is mandatory for all planning and cost estimation. Key timeline requirements include the completion of Service Phase 8 for full-day areas by December 31, 2029, with provisions for potential further service phases. Bidders must demonstrate financial stability, including professional liability insurance of at least €3.0 million for personal injuries and €1.5 million for other damages, along with an average net turnover of at least €250,000 for comparable services over the past three years.
TENDER BRIEF
The contract timeline includes the following key milestones and phases:
- Completion of Service Phase 8 for full-day areas: December 31, 2029.
- The project is structured into staged commissioning ("abschnittsweise Beauftragung") and various service phases ("Leistungsstufen").
- Initial Service Phases (Stufe 1): Includes "Grundlagenermittlung und Vorplanung" (basic evaluation and preliminary planning) and "Entwurfsplanung und Genehmigungsplanung" (design planning and approval planning).
- Further Service Phases (Stufe 2 & 3): May include "Entwurfsplanung und Genehmigungsplanung", "Ausführungsplanung, Vorbereitung der Vergabe und Mitwirkung bei der Vergabe" (detailed design, preparation of award, and assistance with award procedures), and "Bauüberwachung und Dokumentation sowie Objektbetreuung" (construction supervision, documentation, and property management).
- The contractor is obligated to perform further services in subsequent stages if no more than 6 months have passed since the completion of the last assigned service and the client announces the transfer at least 4 weeks in advance.
- A "Zeit- und Ablaufplan" (time and execution schedule) for planning, awarding, and execution will be prepared by the client or a third party immediately after the contract is concluded, based on the specified dates for "Baubeginn" (start of construction), "Nutzungsbeginn" (start of use), and "Fertigstellungstermin" (completion date). However, these specific dates for "Baubeginn," "Nutzungsbeginn," and "Fertigstellungstermin" are marked as "siehe § 8.5" or "siehe 8.5" in the document, and § 8.5 only provides the "Abschluss LPH 8" date.
Explicit contract start date, overall end date, or total duration are not explicitly stated as single items.
Sources
- 1Vertragsentwurf.pdf — “S. 469 ff./547 - in der zum Zeitpunkt des Vertragsabschlusses geltenden Fassung über die gewissenhafte Erfüllung seiner Obliegenheiten nach dem Verpflichtungsgesetz vor der vom Auftraggeber dafür anzugebenden Stelle abzu…”
- 2Vertragsentwurf_Korrektur 24.08.2026.pdf — “Planungs- und Überwachungsziele beauftragt werden sollen: 3.2.2 Stufenweise Beauftragung Haben sich die Parteien in der Zielfindungsphase nach § 3.2.1 des Vertrages über die Planungs- und Überwachungsziele geeinigt und h…”
The core scope of work and statement of work summary for this tender encompasses several key phases and deliverables:
1. Basic Evaluation (Grundlagenermittlung): This involves clarifying the task, determining planning conditions, advising on service requirements, and summarizing, explaining, and documenting the findings in a structured written form to provide a comprehensive overview of the project's foundations.
2. Preliminary Design (Vorplanung): This phase focuses on analyzing and preparing the fundamental requirements, coordinating services with other planning participants, and developing a planning concept. Key activities include pre-dimensioning systems, investigating alternative solutions (including economic considerations), graphical representation (at least 1:200 scale), defining space requirements, creating functional schematics for each system, clarifying technical interdependencies, conducting preliminary negotiations with authorities for approval, estimating costs (at least to the 3rd level of DIN 276:2018-12), and establishing a timeline.
3. Draft Design (Entwurfsplanung): The objective is to develop an approvable, technically, and economically appropriate draft. This includes elaborating the planning concept to a complete draft, defining all systems and components, calculating and dimensioning technical systems, estimating annual consumption values and operating costs, graphically representing the design (at least 1:100 scale), detailing functional and schematic diagrams, listing all systems with technical data for energy balancing, providing detailed system descriptions, and transferring calculation results to other planning participants for required verifications. It also involves coordinating structural planning requirements, conducting negotiations for approval with authorities, and creating a cost estimate based on DIN 276:2018-12 (at least to the 3rd level) and a timeline.
4. Preparation of Tender Documents (Aufstellen der Vergabeunterlagen): This involves determining quantities for bills of quantities, preparing tender documents (including bills of quantities for various service areas and maintenance services based on existing regulations), coordinating interfaces with other planning participants, determining costs based on priced bills of quantities, and implementing cost control by comparing planning-oriented and execution-oriented cost calculations. The contractor must compile tender documents in accordance with applicable public procurement regulations, using standard templates, and ensure that the content does not allow conclusions to be drawn about the contractor or other participating freelancers.
5. Assistance in Awarding (Mitwirkung bei der Vergabe): The contractor is responsible for obtaining offers and preparing the necessary documents for public tender announcements.
Sources
- 1Vertragsentwurf.pdf — “wirtschaftlichen Handeln folgt. Dieser Prämisse sind, sofern der Auftraggeber nicht ausdrücklich etwas anderes anordnet, auch gestalterische und architektonische Gesichtspunkte unterzuordnen. Der Auftragnehmer hat zu bea…”
- 2Vertragsentwurf_Korrektur 24.08.2026.pdf — “genommen werden dürfen, wenn der Auftraggeber die Leistungen der abgeschlossenen Leistungsphase entgegengenommen und seine Zustimmung zur Fortführung der Arbeiten gegeben hat. Die Billigung von Planungsergebnissen stellt…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 23 FILES
- 260729_02.03_Grundriss-EG.PDF2.3 MBPDF
- Beiblatt B Referenzliste HLS.xlsx56 KBXLSX
- Beiblatt A.docx44 KBDOCX
and 16 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.