UzK, Geb.304, Biozentrum, Fachplanung, TGA, KG 410-450, 470+480
Notice number: 00539909-2026
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Universität zu Köln Vergabestelle Bau
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 4, 2026
TENDER DESCRIPTION
This tender seeks comprehensive specialist planning services for the technical equipment ("Technische Ausrüstung") of existing climate chambers within the UzK, Bldg.304, Biozentrum, encompassing all HOAI Leistungsphasen from basic evaluation (LP 1) through object supervision (LP 8). The scope primarily involves new planning or revision of MEP systems, with structural interventions limited to necessary adjustments for MEP integration, ensuring precise temperature and humidity control for S1-Lab climate chambers. Key technical requirements include adherence to UzK's current technical standards, utilization of specified brands and technologies such as ABB, KNX, DALI, and BACnet MS/TP, and compliance with German standards including DIN EN ISO 9001 for quality management and relevant safety regulations like fire protection and barrier-free construction. The project is structured into distinct stages, commencing February 1, 2027, with initial stages having durations of 4 to 8 weeks, and requires professional liability insurance coverage of at least 2 million Euro for personal injury and 1 million Euro for property damages.
TENDER BRIEF
The contract timeline is structured into several phases with specific durations, but a general contract start date, end date, or total duration is not explicitly stated.
The key milestones and phases are as follows:
- Stufe 1: Begins on February 1, 2027, with a maximum realization period of four weeks. This stage involves "Grundlagenermittlung und Vorplanung" (basic evaluation and preliminary planning), corresponding to Leistungsphasen 1 and 2 according to § 55 HOAI.
- Stufe 2: To be completed within four weeks after its commencement. This stage covers "Entwurfsplanung" (design planning), which is Leistungsphase 3 according to § 55 HOAI.
- Stufe 4: To be completed within four weeks after its commencement. This stage corresponds to "Ausführungsplanung" (execution planning), Leistungsphase 5 according to § 55 HOAI.
- Stufe 5: To be completed within eight weeks. This stage includes "Vorbereiten der Vergabe und Mitwirken bei der Vergabe" (preparation and assistance in awarding contracts), corresponding to Leistungsphasen 6 and 7 according to § 55 HOAI.
- Stufe 6: To be completed within four weeks. This stage covers "Objektüberwachung und Objektbetreuung" (object supervision and support), corresponding to Leistungsphasen 8 and 9 according to § 55 HOAI.
The start dates for Stufen 2 to 6 will be mutually agreed upon by the parties based on the updated construction schedule. If no agreement is reached, the client is entitled to determine the start date at its reasonable discretion. The client also has the right to order an extension of the execution times or to agree on different contract dates when a subsequent stage is called off. An extension of the project duration by 6 months, related to the processing periods mentioned in § 10 Abs. 4, is already covered by the agreed remuneration.
Sources
- 1VV_260729_Fachplanervertrag_TGA.docx — “nur dann berufen, wenn diese aus dem Risikobereich des Auftraggebers stammen oder durch höhere Gewalt oder andere für den Auftragnehmer unabwendbare Umstände verursacht waren. (4) Als für den Auftragnehmer verbindliche V…”
The core scope of work for this tender primarily involves comprehensive services for technical equipment ("Technische Ausrüstung") across multiple project phases, from initial conceptualization to execution monitoring and documentation.
The key deliverables and activities for each phase are:
Leistungsphase 1 (Basic Evaluation):
- Clarifying the task based on the client's specifications or demand planning, in consultation with the object planner.
- Determining planning parameters and advising on service requirements, including technical infrastructure if necessary.
- Summarizing, explaining, and documenting the results.
Leistungsphase 2 (Preliminary Planning):
- Analyzing fundamentals and coordinating services with other planning participants.
- Developing a planning concept, which includes preliminary dimensioning of systems and key plant components, investigating alternative solutions with economic considerations, graphical representation for integration into object planning, and specifying space requirements.
- Creating a functional diagram or principle circuit diagram for each system.
- Clarifying and explaining essential interdisciplinary processes, parameters, and interfaces, and assisting with the integration of technical systems.
- Conducting preliminary negotiations with authorities regarding approval feasibility and with relevant infrastructure stakeholders.
- Estimating costs according to DIN 276 (level 2) and assisting with scheduling.
- Summarizing, explaining, and documenting the results.
Leistungsphase 3 (Draft Planning):
- Developing the planning concept (step-by-step solution) considering all specialist requirements and integrated specialist planning by the object planner, leading to a complete draft.
- Defining all systems and plant components.
- Calculating and dimensioning technical systems and components, and estimating annual costs.
Leistungsphase 5 (Execution Planning):
- Developing the execution planning based on the results of phases 3 and 4 (step-by-step solution development) considering specialist planning integrated by the object planner, leading to an execution-ready solution.
- Updating calculations and dimensioning for the design of technical systems and components, including graphical representation of systems in a coordinated scale and detail level (excluding assembly or workshop plans), adjusting and detailing functional and schematic diagrams, and coordinating execution drawings with the object planner and other specialist planners.
- Creating penetration and opening plans.
- Updating the schedule.
- Updating the execution planning to reflect tender results and the object planner's execution planning, and handing over the updated planning to the executing companies.
- Reviewing and approving assembly and workshop plans from executing companies for compliance with execution planning.
Leistungsphase 6 (Preparation for Awarding Contracts):
- Determining quantities as a basis for creating bills of quantities, in coordination with contributions from other specialist planners.
- Preparing tender documents, particularly bills of quantities by service area, including maintenance services based on existing regulations.
- Assisting in coordinating interfaces with service descriptions of other specialist planners involved in the planning.
- Determining costs based on bills of quantities priced by the planner.
- Controlling costs by comparing priced bills of quantities with cost calculations.
- Compiling tender documents.
Leistungsphase 7 (Participation in Awarding Contracts):
- Obtaining offers.
- Reviewing and evaluating offers, preparing price comparisons by individual positions, and reviewing and evaluating offers for additional or changed services from executing companies and the appropriateness of prices.
- Conducting bidder discussions.
- Comparing tender results with bills of quantities priced by the planner and cost calculations.
- Preparing award recommendations and assisting with the documentation of award procedures.
- Compiling contract documents and assisting with contract award.
- Special services include reviewing and evaluating alternative offers with impacts on the coordinated planning, and participating in review procedures.
Leistungsphase 8 (Object Supervision):
- Monitoring the execution of the project for conformity with public permits or approvals, contracts with executing companies, execution documents, assembly and workshop plans, relevant regulations, and generally accepted technical standards.
- Assisting in coordinating project participants.
- Establishing, updating, and monitoring the schedule (bar chart).
- Documenting the construction progress (construction diary).
- Reviewing and evaluating the necessity of changed or additional services from contractors and the appropriateness of prices.
- Joint measurement.
- Special services include performing performance measurements, functional tests, and energy monitoring, with documentation of results and deviations during commissioning, as well as responsible execution of functional and load integration tests for climate chambers.
The project is structured into stages with defined completion times: Stage 1 (4 weeks), Stage 2 (4 weeks after start), Stage 4 (4 weeks after start), Stage 5 (8 weeks), and Stage 6 (4 weeks). The start times for stages 2 to 6 are to be mutually agreed upon based on the updated construction schedule. The results of each service phase must be presented to the client and object planner for approval before proceeding to the next phase.
Sources
- 1VV_260729_Fachpl-Vertr_TGA_Anl_1.xlsx — “Bewertungstabelle für das Leistungsbild Technische Ausrüstung,,, Leistungsphase 1,,, ,,, beauftragt,Beschreibung,Bewertung,beauftragt mit ,a) Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des…”
- 2VV_260729_Fachpl-Vertr_TGA_Anl_1 (1).xlsx — “Bewertungstabelle für das Leistungsbild Technische Ausrüstung,,, Leistungsphase 1,,, ,,, beauftragt,Beschreibung,Bewertung,beauftragt mit ,a) Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des…”
- 3VV_260729_Fachpl-Vertr_TGA_Klimakammern_304_UG_Anl_3.xlsx — “nicht erfasst sind.",,,gem. Vertrag inkl.," " Z,Integration bereits ausgeführter Teilleistungen,,,0, Z,"Erforderlichen objektplanerischen Koordinationsleistungen, soweit diese zur Umsetzung der Maßnahme notwendig sind",,…”
- 4VV_260729_Fachplanervertrag_TGA.docx — “nur dann berufen, wenn diese aus dem Risikobereich des Auftraggebers stammen oder durch höhere Gewalt oder andere für den Auftragnehmer unabwendbare Umstände verursacht waren. (4) Als für den Auftragnehmer verbindliche V…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 617 FILES
- leer.txt6 BTXT
- leer.txt6 BTXT
- leer.txt6 BTXT
and 610 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.