Published
Perceel 1: Vertalingen ten behoeve van de uitvoering van het primaire proces
Notice number: 434126
KEY INFORMATION
- Submission deadline
- • Nov 9, 2026
- Location
- 🇳🇱 Netherlands
- Contracting authority
- Ministerie van Justitie en Veiligheid
- Accepted Languages
- Dutch
- Tender type
- Services
- Contract Value
- Published date
- Jul 22, 2026
TENDER DESCRIPTION
This tender seeks a qualified contractor for the provision of comprehensive Translation Services for Lot 1, ensuring compliance with ISO 17100:2015 standards, which mandates translation by a translator and revision by a revisor. The scope encompasses coordinating and executing translation orders, including building translation memories, managing terminology files, offering value-added services like editing and audio transcription, and establishing a Smartflow-based order and delivery process with API integration. The contractor must adhere to specific technical requirements, including digital coupling with the participant's SmartFlow system via API, using an acceptance environment for testing, and utilizing Rbtv registered translators, alongside conforming to Bijlage 7-A Gegevensset and NLCIUS standard norms for data exchange. The agreement proposes a start date of January 4, 2027, with an implementation period of up to three months, targeting full operational service by April 15, 2027. The initial operational period is 24 months, with potential extensions for a maximum total contract term of 48 months, concluding no later than April 15, 2032.
TENDER BRIEF
Question: What is the contract timeline?
Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.
The contract timeline includes the following:
- Contract Start Date: The proposed start date for the agreement and implementation is Monday, January 4, 2027.
- End Date: The initial operational period is 24 months following the implementation phase. The agreement can be silently extended for a maximum of 24 months, and further extended for an additional maximum of 12 months as a bridging period. Considering the service must be fully operational by April 15, 2027, the earliest end date for the initial operational period would be April 15, 2029. With all possible extensions, the contract could run until April 15, 2032.
- Total Duration: The initial duration of the contract is 24 months plus the implementation period. The implementation period for IND Lot 1 is a maximum of 3 months. The agreement, including extensions, has a maximum total term of 48 months.
- Key Milestones and Phases:
- Prebid Phase:
- Deadline for submitting questions (first round): Monday, September 14, 2026.
- Answers to first round questions (sending Information Memorandum 1): Monday, September 28, 2026, until 10:00 AM.
- Deadline for submitting questions (second round): Monday, October 19, 2026.
- Answers to second round questions (sending Information Memorandum 2): Monday, November 9, 2026, before 10:00 AM.
- Deadline for submitting bids: Monday, November 9, 2026, before 10:00 AM.
- Intended date for notification of Award Decision: Monday, December 7, 2026.
- Contract Start and Implementation:
- Proposed contract start date: Monday, January 4, 2027.
- Start of implementation: Monday, January 4, 2027.
- Implementation Phases: The implementation period is divided into three phases:
- Phase 1: Preparation for implementation: Duration of 2 weeks. This includes assembling the implementation team, establishing communication structure, delivering a detailed work document, and a continuity plan.
- Phase 2: Implementation: Duration of 2.5 months. This involves implementing the service at the Participants/Client, setting up processes, developing user manuals, filling the Digital Application Plan (DAP), and conducting information meetings.
- Operational Service Start: The latest date for the service to be fully operational and for the Participant to start operational use of the agreement is Thursday, April 15, 2027.
- Phase 3: Evaluation period: Duration of 3 months after the operational start date. This includes weekly monitoring of Key Performance Indicators (KPIs) and Performance Indicators (PIs), joint steering, informing the central contract manager, and concluding the implementation with a survey.
- Contract Duration and Extensions:
- Initial operational period: 2 years (24 months) after implementation.
- Automatic extension: Maximum of 24 months, with a 3-month notice period.
- Additional extension: Maximum of 12 months as a bridging period if a new agreement cannot be concluded in time.
Sources
- 1Beschrijvend document Vertaaldienstverlening V1.0.pdf — “waarop de ingediende vragen schriftelijk worden beantwoord (versturen Nota van Inlichtingen 1) | Maandag 14 september 2026 Uiterste gelegenheid tot het indienen van vragen (tweede vragenronde) | Maandag 28 september 2026…”
- 2Bijlage F Concept ROK Vertaal IND V1.0.pdf — “| 20 juli 2026 2. Duur van de Overeenkomst 2.1 Deze Overeenkomst gaat in op 4 januari 2027 voor de duur van 24 maanden plus de periode voor de implementatie. Direct na ingangsdatum van de Overeenkomst wordt gestart met d…”
- 3Bijlage 10-A Implementatieplan Vertaal IND v1.0.pdf — “acties en/of noodzakelijke aanpassingen. Pagina 4 van 11 Bijlage 10-A | Leidraad/ kaders implementatieplan Europese aanbesteding 7607361 Vertaaldienstverlening ten behoeve van de IND | 20 juli 2026 2. Opbouw leidraad De…”
The core scope of work for this tender involves the provision of Translation Services across two distinct lots, ensuring that each order is executed according to the established agreement. The contractor is responsible for delivering these services in compliance with the ISO 17100:2015 standard, which mandates that translations are performed by a translator and subsequently revised by a revisor. The contractor must also meet the participant's needs by ensuring orders are delivered and executed within the contractual framework.
The statement of work summary outlines several key deliverables and responsibilities:
- Ensuring maximum delivery certainty and actively preventing non-deliveries.
- Coordinating and executing translation orders, which includes accepting and registering orders, and selecting and deploying suitable translators based on the specific assignment and agreed terms.
- Delivering and executing specific tasks such as building translation memories and managing terminology files and/or style guides.
- Providing Value Added Services, including editing and transcription of audio content.
- Recruiting, selecting, and training translators to maintain an adequate pool of qualified professionals for all required languages throughout the contract duration.
- Coordinating and managing all associated financial and administrative tasks related to translation assignments.
- Measuring, registering, and reporting on the contractor's performance, encompassing the timely execution and duration of translation assignments, as well as the quality of deployed translators and the overall execution of the work.
- Establishing and maintaining supporting facilities for the translation services, such as a Smartflow-based order and delivery process with API integration, a help/service desk available on weekdays from 08:00 to 18:00, and a quality management system.
- Achieving the tender's objectives, which include ensuring quality, efficient and modern working methods, cost-effectiveness, and good client and contractor practices.
- Handling project-specific requirements like on-site translation, building translation memories, managing terminology files (excluding personal data), and bulk translations.
- The tender also aims for the contractor to implement innovative solutions, such as translation templates for standard documents, to enhance efficiency and effectiveness.
Translations posing a high risk to the State or documents requiring special conditions are explicitly excluded from this tender.
Sources
- 1Beschrijvend document Vertaaldienstverlening V1.0.pdf — “dienstverlening bij bulkopdrachten: Het doel van IND is een leverancier te contracteren die continuïteit en kwaliteit van de reguliere dienstverlening kan garanderen bij bulkopdrachten. Bulkopdrachten zijn vertalingen va…”
- 2Bijlage 3 P1 PVE Vertaal IND v1.0.pdf — “| Eisen inzake privacy | 20 4.2 | Eisen inzake informatiebeveiliging | 20 4.3 | Eisen inzake fysieke toegang | 24 5. | Commerciële Eisen | 24 5.1 | Eisen inzake Vergoedingen | 24 5.2 | Eisen inzake (e-)Facturatie | 25 6.…”
- 3Bijlage 3-P2 PVE Vertaal IND 1.0.pdf — “moeten worden uitgevoerd, waaronder: Het aannemen en de registratie van een Bestelling; De selectie en Levering van (geschikte) Vertalers. Dit afgestemd op de bestelde Vertaalopdracht en de overeengekomen voorwaarden; 4.…”
- 4Bijlage 10-A Implementatieplan Vertaal IND v1.0.pdf — “aanbesteding 7607361 Vertaaldienstverlening ten behoeve van de IND | 20 juli 2026 1. 1.1 Inleiding Aanleiding De Overeenkomst ten behoeve van de Vertaaldienstverlening IND wordt gesloten op basis van de gunning van de Eu…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 35 FILES
- Bijlage 5-P1 DFA Vertaaldienst IND v1.0.pdf317 KBPDF
- Bijlage 7-B CSV file_VD_3.8.xlsx47 KBXLSX
- Beschrijvend document Vertaaldienstverlening V1.0.pdf618 KBPDF
and 28 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.