VSZK - Ausschreibung BKP 230 Elektroarbeiten
Notice number: 00517525-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇨🇭 Switzerland
- Contracting authority
- Hochbauamt Kanton Schwyz
- Accepted Languages
- German
- Tender type
- Works
- Contract Value
- Published date
- Jul 27, 2026
TENDER DESCRIPTION
This tender, titled "VSZK - Tender BKP 230 Electrical Works," encompasses extensive electrical installations and infrastructure at the Kaltbach site in Schwyz, with project commencement anticipated in September 2026 and completion by December 2029 over a 38-month execution phase. The core scope includes the delivery and installation of high-voltage and low-voltage systems, emergency power generators, UPS systems, diverse lighting and power installations, switchgear assemblies, comprehensive cabling (including shielded and fiber optic), and the realization of data center infrastructure with hot/cold aisle containment and gas extinguishing system integration. Key technical specifications mandate adherence to Bluetooth 5.1, RFID/NFC, 4G LTE-M, and Wi-Fi 2.4 GHz, strict electrical parameters such as 400V/50Hz nominal voltage, 22KW Type 2 charging, IP54/IK10 protection, and UPS systems with specific autonomy (minimum 20 minutes for both 83kW and 60kW loads) utilizing pure lead AGM batteries with a 15-year design life, all while requiring halogen-free materials and a minimum 25% expansion reserve for components. Bidders must demonstrate sound financial standing, including no pending…
TENDER BRIEF
The contract timeline is as follows:
- Contract Start Date: The project is anticipated to begin in September 2026. The contract itself becomes effective upon the signing by the parties.
- Contract End Date: The project completion is anticipated for December 2029.
- Total Duration: The execution phase is stated to be 38 months.
- Key Milestones/Phases:
- Triggering of the execution phase: May 4.
- Start of the execution phase: August 3.
- Shell construction 1 including carpenter work: February 8, 2026.
- Shell construction 2: August 18.
- Expansion 1: March 1.
- Expansion 2: August 16.
- Operating facilities: May 24.
- Surroundings: November 22.
- Remaining work on surroundings.
- Acceptances and defect rectification.
- Handover of work.
Sources
- 1B1_2303_VSZK_Entwurf Werkvertrag KBOB_260122.pdf — “die Haftung wegen Mängeln (Ziffer 5.1) abgelöst. Form Die von der Bauherrschaft in der Ausschreibung vorgelegten Formulare betreffend Sicherheitsleistungen sind zwingend zu verwenden. Vorlage Erfüllungsgarantie gem. Beil…”
- 2B2_2303_VSZK_OBB_260121.pdf — “Leistung / Arbeiten | Lieferdatum | Summe (exkl). Weitere Bestätigungen und Nachweise. Alle Abnahmeprotokolle vom Unternehmer unterzeichnet sind. ☐Ja Nein ☐ Bestätigung von Subunternehmer und Lieferanten, dass alle ihre…”
- Bluetooth 5.1 (BR/EDR/BLE)
- RFID/NFC reader - ISO/IEC 14443 A (Type A, 13.56 MHz)
- ISO/IEC 15693 (Mifare classic, 13.56 MHz)
- 4G LTE-M
- Wi-Fi 2.4 GHz
- IEEE 802.11 b/g/n (channels 1-11)
- Powerline (PLC) - HomePlug Green PHY®, 10 Mbit/s
- LCD-Display (for visualization)
- Nennspannung: 400 V/50 Hz (no deviation allowed)
- Ladeleistung: 22 KW, regulatable via interface (no deviation allowed)
- Ladeanschluss: Type 2 up to 22 kW (3LN) with 7.5 m cable length and winding device, IP54 (no deviation allowed)
- Ladestrom: Mode 3, up to 32 A, 3-phase (no deviation allowed)
- Bemessungsstossspannung: 4 kV (no deviation allowed)
- Bemessungskurzschlussstrom: 10 KA (no deviation allowed)
- Schutzklasse: IP54, IK10 (no deviation allowed)
- Energiezähler: calibrated digital energy meter included (no deviation allowed)
- Kompakte Stand-Alone Architektur (for UPS systems)
- Online-Doppelwandler-Technologie (VFI-SS-111) (for UPS systems)
- Batterietechnologie: Reinblei-AGM-Batterien, Eurobat-Klassifizierung >12 Jahre ("Very Long Life"), Design Life 15 Jahre
- Unterbrechungsfreie Lastumschaltung on the utility grid via external service bypass
- SNMP-Netzwerkadapter (for external monitoring of UPS, e.g., NetMan 208)
- Protocols for data transmission to higher-level network/building management systems: TCP/IP, SNMP, Modbus/TCP, BACnet/IP
- Autonomy time for USV 1: minimum 20 minutes (at 83 kW load)
- Autonomy time for USV 2: minimum 20 minutes (at 60 kW load)
- Batteriealterungsfaktor: 1.25 (must be considered in design)
- Halogenfreie Materialien (wires, conduits, etc.)
- Überspannungsschutz (surge protection) per feed
- Materials must be reliably protected against corrosion
- Screw connections must be secured against loosening
- Minimum 25% expansion reserve for casing, apparatus grid, plastic channels, terminal rail, and similar components
Sources
- 100_2303_VSZK_Submission 232 236 Installationen.pdf — “5.1 (BR/EDR/BLE), RFID/NFC reader - ISO/IEC 14443 A (Type A, 13.56 MHz) ISO/IEC 15693 (Mifare classic, 13.56 MHz) 4G LTE-M, Wi-Fi 2.4 GHz, IEEE 802.11 $11~b/g/n$ (channels 1-11) Powerline (PLC) - HomePlug Green PHY®, 10…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 67 FILES
- B19.3_2303_VSZK-ELE-Modell .ifc65.2 MBIFC
- SIA451_2026-07-06.crbx148 KBCRBX
- B18.13_2303_VSZK-ELE-23-0067-Prinzipschema Kommunikation_2026-06-01.pdf110 KBPDF
and 60 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.