Published
6. část – Střední škola prof. Zdeňka Matějčka, Ostrava-Poruba
Notice number: 00541070-2026
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇨🇿 Czechia
- Contracting authority
- Moravskoslezský kraj
- Accepted Languages
- Czech
- Tender type
- Services
- Contract Value
- Published date
- Aug 5, 2026
TENDER DESCRIPTION
This tender, for Part 6 – Secondary School Prof. Zdeněk Matějček, Ostrava-Poruba, seeks a contractor to provide comprehensive engineering and investor activities, including technical supervision (TDS) and health and safety coordination (BOZP) services for the realization of a photovoltaic power plant installation. The extensive scope of work covers detailed documentation review, financial oversight, quality assurance, site and project management, systematic photographic documentation, compliance checks against Modernization Fund and DNSH conditions, along with managing permitting processes and defect resolution through to project completion. The contract timeline is milestone-based, commencing upon its entry into force and concluding upon the client's acceptance of completed construction, resolution of defects, issuance of the building approval decision, or provision of Permanent Operation of the Plant (UTP). Financial standing requirements stipulate no overdue tax, social security, or public health insurance liabilities in the Czech Republic or country of residence, and not being in liquidation, bankruptcy, or compulsory administration. Furthermore, a technical prerequisite for…
TENDER BRIEF
The contract timeline is defined by project milestones rather than fixed dates. The engineering activity commences immediately upon the contract's entry into force. It concludes upon the later of these events: the acceptance of the completed construction by the client and the resolution of any remaining defects from the acceptance procedure, the issuance of the building approval decision, or the provision of Permanent Operation of the Plant (UTP).
Key phases mentioned for remuneration include:
- Engineering activity performed from the contract's entry into force until the handover of the construction site to the contractor (before construction begins).
- Engineering activity carried out during the construction phase.
- Engineering activity from the start of the acceptance procedure for the completed construction until the overall completion of engineering activity as defined in Article IV, paragraph 2 of the contract.
Specific contract start and end dates (e.g., calendar dates) and a total duration in a fixed period are not explicitly stated in the provided documents.
Sources
- 11.2. Smlouva cast 2.docx — “ihned po nabytí účinnosti této smlouvy. Inženýrská činnost bude prováděna do: převzetí hotové stavby příkazcem a odstranění poslední vady z přejímacího řízení stavby (pokud byla stavba převzata s vadami) nebo do vydání k…”
- 21.5. Smlouva cast 5.docx — “bude prováděna do: převzetí hotové stavby příkazcem a odstranění poslední vady z přejímacího řízení stavby (pokud byla stavba převzata s vadami) nebo do zajištění Umožnění trvalého provozu výrobny (UTP, dříve PPP – první…”
The core scope of work for this tender is the performance of technical supervision (TDS) and health and safety coordinator (BOZP) services for the realization of photovoltaic power plant (FVE) installations at various regional organizations.
The Statement of Work (SOW) summary and core deliverables include:
- Engineering and Investor Activities: Executing engineering and investor activities for the construction of FVE installations at specified locations.
- Technical Supervision (TDS): Ensuring timely and quality execution of the construction work by the contractor in accordance with the contract, public law decisions, construction documentation, the contractor's bid budget, construction costs, valid ČSN technical standards, and general legal regulations.
- Health and Safety Coordination (BOZP): Performing the role of the health and safety coordinator at the construction site, as per relevant laws such as Act No. 309/2006 Sb.
- Documentation Review: Thoroughly reviewing all project documentation, including the project execution documentation (DPS), contract terms, and public law decisions, especially building permits.
- Financial Oversight: Regularly controlling invoices for compliance with the contract and bill of quantities.
- Quality Assurance: Inspecting parts of deliveries before they are covered, with photographic documentation and logging in the construction diary. Verifying adherence to technological procedures and conducting prescribed material and construction tests, along with checking their results (e.g., certificates, attestations).
- Site and Project Management: Coordinating work handover to other contractors, collaborating with the project designer and contractor to ensure consistency with DPS and resolve any defects. Proposing measures to enhance future operational efficiency and mitigate damages.
- Reporting and Meetings: Maintaining construction and assembly diaries in compliance with regulations. Organizing and chairing control meetings, preparing and distributing minutes to relevant parties within one working day.
- Photographic Documentation: Systematically taking detailed photographs of the construction, including the original state, with monthly digital submissions. Initial state photos are due within two weeks of site handover.
- Final Expert Opinion: Producing a conclusive statement from the expert technical supervision concerning the FVE installation.
- Compliance Checks for Funding: Verifying contractor-submitted documents for handover and acceptance, specifically against Modernization Fund conditions, including warranty tests and UPOS documents. Continuously monitoring the contractor's adherence to DNSH (Do No Significant Harm) conditions and preparing a draft "Confirmation of compliance with DNSH requirements/conditions" post-construction, encompassing circular economy principles.
- Handover Protocols: Participating in handover and acceptance meetings for completed construction and preparing corresponding protocols.
- Post-Completion Checks: Inspecting documents for handover against contract, DPS, and bill of quantities. Verifying the rectification of defects identified during handover and site clearance.
- Permitting and Inspections: Managing the application process for occupancy permits, including obtaining necessary approvals and submitting them to the building authority. Providing the original occupancy permit to the client and participating in related inspections.
- Defect Resolution: Confirming the resolution of defects noted during the final inspection by the building authority.
Sources
- 1Priloha c. 3_Kryci list.docx — “KRYCÍ LIST NABÍDKY Název VZ: | Výkon TDS a koordinátora BOZP při realizaci staveb "Instalace FVE na krajských organizacích“ Dodavatel podává nabídku do 1. části: | ANO / NE Dodavatel podává nabídku do 2. části: | ANO / N…”
- 2Priloha c. 4_Cestne prohlaseni o splneni kvalifikace.docx — “ČESTNÉ PROHLÁŠENÍ KE SPLNĚNÍ KVALIFIKACE A ZKUŠENOSTÍ HLAVNÍHO PROJEKTANTA PRO ÚČELY HODNOCENÍ NABÍDEK ve smyslu ust. § 74, § 77 a § 79 odst. 2 zákona č. 134/2016 Sb., o zadávání veřejných zakázek, ve znění pozdějších př…”
- 3TDS_Zadávací dokumentace.pdf — “činnosti včetně výkonu technického dozoru stavebníka a koordinátora BOZP při realizaci instalací fotovoltaické elektrárny. Místo plnění: Frýdecká 689/30, Český Těšín - Gymnázium Josefa Božka, p. č. 1489/2 k. ú. Český Těš…”
- 41.1. Smlouva cast 1.docx — “je zajištění dozoru nad včasným a kvalitním provedením díla prováděného zhotovitelem stavby (dále jen „zhotovitel“) tak, aby dílo bylo provedeno v souladu se smlouvou uzavřenou se zhotovitelem, veřejnoprávními rozhodnutí…”
- 51.2. Smlouva cast 2.docx — “nad včasným a kvalitním provedením díla prováděného zhotovitelem stavby (dále jen „zhotovitel“) tak, aby dílo bylo provedeno v souladu se smlouvou uzavřenou se zhotovitelem, veřejnoprávními rozhodnutími, s dokumentací pr…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 12 FILES
- 1.3. Smlouva cast 3.docx85 KBDOCX
- Šifrovací N006-26-V00024630 Výkon TDS a koordinátora BOZP při realizac.cer1 KBCER
- Priloha c. 4_Cestne prohlaseni o splneni kvalifikace.docx35 KBDOCX
and 5 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.