Published

    Zaprojektowanie, dostawa i montaż instalacji paneli fotowoltaicznych w ramach realizacji projektu pn.: „Budowa instalacji paneli fotowoltaicznych dla budynków użyteczności publicznej w Gminie Aleksandrów Łódzki”

    Notice number: 00694336-2026

    🇵🇱 PolandGmina Aleksandrów ŁódzkiGoods

    KEY INFORMATION

    Submission deadline
    • Oct 26, 2026
    Location
    🇵🇱 Poland
    Contracting authority
    Gmina Aleksandrów Łódzki
    Accepted Languages
    Polish
    Tender type
    Goods
    Contract Value
    Published date
    Oct 8, 2026

    TENDER DESCRIPTION

    This tender seeks a contractor for the design, supply, and installation of photovoltaic panel systems, including integrated energy storage, for nine public utility buildings within the Municipality of Aleksandrów Łódzki, executed under a "design and build" framework. The scope encompasses comprehensive design documentation, permit acquisition, equipment procurement, construction, commissioning, user training, system monitoring access, and post-installation reporting to relevant authorities, alongside a commitment to free technical inspections during the warranty period. Key technical specifications include utilizing LFP (Lithium Iron Phosphate) modular energy storage systems with a minimum capacity of 5kWh per module and high-voltage capabilities, and adherence to specific mounting requirements for various roof types and supporting structures, ensuring compliance with relevant wind and snow zone norms. The project is co-financed by the European Union and requires the achievement of specific product indicators, such as 0.49 MW additional RES capacity and 0.79 MWh energy storage capacity, as well as a result indicator of 440 MWh/year electricity generated from RES over a five-year…

    TENDER BRIEF

    The contract timeline information explicitly stated includes the following:

    • The project has a durability period of 5 years, starting from the final acceptance date of the subject of the agreement.
    • The Contractor is required to submit a written proposal for the material and financial schedule (Harmonogram rzeczowo – finansowy) within 14 days from the date of signing the agreement.
    • The Contracting Authority has 7 days from receiving the schedule to approve it or provide comments.
    • If comments are provided, the Contractor must incorporate justified changes and submit a revised schedule within 5 days of receiving the comments.
    • The finalized material and financial schedule will serve as Appendix No. 3 to the agreement and will be the basis for the financial and timely settlement of the agreement.

    The contract start date, end date, and total duration of the execution phase are not explicitly stated.

    Sources

    • 1SWZ wraz z załącznikami tekst jednolity po zmianach.docx — “terminu końcowego odbioru przedmiotu umowy. Okres trwałości przedsięwzięcia wynosi 5 lat od dnia odbioru końcowego przedmiotu umowy. § 3. HARMONOGRAM RZECZOWO – FINANSOWY Przedmiot umowy określony w § 1 niniejszej umowy…”

    The core scope of work for this tender involves the construction of photovoltaic panel installations for public utility buildings in the Aleksandrów Łódzki Commune.

    The Statement of Work (SOW) summary and core deliverables explicitly include:

    • Design Documentation: This covers the execution of design documentation, including executive designs, building designs (if applicable), necessary technical calculations, plans, drawings, electrical diagrams for PV installations and energy storage, fire safety instructions, and health and safety information. Coordination with the Provincial Office for the Protection of Monuments for CarPorts and obtaining necessary opinions, consents, expert opinions, agreements, and permits are also required.
    • Permits and Approvals: Obtaining all necessary opinions, consents, expert opinions, agreements, and permits, along with making required notifications.
    • Supply of Equipment: Delivery of photovoltaic panels, hybrid inverters, energy storage systems, energy meters, and other essential devices and components.
    • Construction and Installation: Execution of all construction and assembly works.
    • Specific structures include: steel structure for flat roofs (329.5 kW total panel power), structures for pitched roofs covered with roofing felt (39 kW), roof tiles (13 kW), and sandwich panels (43.5 kW), and structures with foundations in parking lots (65 kW across 2 locations).
    • Other components include roof penetrations (9 units), energy storage systems (minimum 790 kWh total capacity), RPV-DC distribution boards, and RPV-AC distribution boards for all facilities, all in accordance with the Functional-Utility Program (PFU).
    • Commissioning: Launching of the installed systems.
    • Monitoring Access: Providing access to applications for monitoring the installation's operation on phones/computers.
    • Training: Training users on how to operate and exploit the installations.
    • Reporting: Registering the installations with the local Distribution System Operator (OSD) and the State Fire Service.
    • Warranty Period Services: Conducting free technical inspections of the photovoltaic installations during the warranty period.
    • Documentation: Preparing documentation to confirm the achievement of product and result indicators.

    All works must adhere to the Functional-Utility Program for the project "Budowa instalacji paneli fotowoltaicznych dla budynków użyteczności publicznej w Gminie Aleksandrów Łódzki," client instructions, construction best practices, and applicable laws, with utmost diligence.

    Sources

    • 1ogłoszenie o zamówieniu 14.08.2026 r..pdf — “w kWp-118, min. pojemność magazynu energii (ME) kWh-160, min. moc inwerterów hybrydowych $(kW)-4\times30kW(120kW)$, posadowienie na dachu budynku. 3. Przedmiot umowy obejmuje w szczególności: 1) wykonanie dokumentacji pr…”
    • 2PFU.pdf — “prowadzone prace montażowe potwierdzone protokołem z wizji lokalnej obiektu podpisanej przez przedstawiciela Zamawiającego i Projektanta; przedstawienie i uzgodnienie z Zamawiającym warunków wyjściowych do projektowania,…”
    • 3SWZ wraz z załącznikami tekst jednolity po zmianach.docx — “JM | ILOŚĆ | NETTO [PLN] | VAT …% [PLN] | BRUTTO [PLN] 1 | dokumentacja projektowa dla instalacji fotowoltaicznych zgodnie z PFU | kpl. | 1 | | | 2 | konstrukcja stalowa na dach płaski typu wklejanego na łączną moc panel…”

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 43 FILES

    • Pływialnia Olimpijczyk.pdf
    • Ekspertyza techniczna dachu_Pływalnia OLIMPIJCZYK_zaplecze budynku.pdf
    • Ekspertyza techniczna dachu_SP4.pdf

    and 36 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders