    Zielfindungsphase Konzepterstellung Wasserfassungen & Pumpwerke

    Notice number: ocds-mnwr74-25693548

    🇩🇪 GermanyStadtwerke Zittau GmbH

    KEY INFORMATION

    Submission deadline
    Sep 14, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Stadtwerke Zittau GmbH
    Accepted Languages
    German
    Tender type
    Contract Value
    Published date
    Aug 9, 2026

    TENDER DESCRIPTION

    This tender seeks engineering services (HOAI Service Phases 1 and 2) for the Target Definition Phase Concept Development for water abstractions and pumping stations, specifically for the WF Oybin (Elfen- & Schulwiese water intakes) and WF Lückendorf pumping station in Zittau, Germany. The core scope involves clarifying rehabilitation priorities for existing facilities, developing technical implementation strategies, establishing timelines, and budgeting for the necessary measures, including the investigation and presentation of at least three technical variants. Key technical requirements include modernizing MSR technology, ensuring parallel pump operations, rehabilitating shafts and pipelines, integrating intrusion detection systems, and planning for transformer station renewal by June 30, 2028. The contract execution period for these planning phases is from September 28, 2026, to October 30, 2026, with billing until December 15, 2026, and fee calculation adhering to HOAI 2021.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract Start Date: September 28, 2026
    • Contract End Date: October 30, 2026
    • Total Duration: The execution period is from September 28, 2026, to October 30, 2026.
    • Key Milestones/Phases:
    • Execution of LP 1 and 2: Until October 30, 2026.
    • Billing: Until December 15, 2026.
    • Zielfindungsphase (Goal-finding phase): This phase involves creating a planning basis, with the contractor performing Leistungsphase 1 (LP1) and Leistungsphase 2 (LP2). During LP2c (or 2e), a minimum of three variants must be investigated, compared, and presented.

    Sources

    • 1Ingenieurleistung-LP1-2_-Konzept-Wasserfassung.pdf — “Projekt: Auftraggeber: Erstellt von: Vergabeart: Leistungsbeschreibung mit Leistungsverzeichnis Ingenieurleistung LP1-2, Konzept Wasserfassung Angebotseröffnung: Ende Zuschlagsfrist: Ausführungsfrist: Bieter: Konzepterst…

    The core scope of work for this tender involves engineering services (LP 1-2) focused on concept creation for water intakes and pumping stations, specifically for WF Oybin and WF Lückendorf.

    The high-level summary of the Statement of Work (SOW) and core deliverables includes:

    • Concept Creation: Developing a concept for the water intakes and pumping stations.
    • Planning Basis: Creating a planning basis because essential planning goals are not yet known.
    • Service Phases: Performing Service Phase 1 and Service Phase 2 of the engineering services.
    • Variant Analysis: Investigating, comparing, and presenting at least three variants during Service Phase 2c (or 2e).
    • Site Inspection: A local inspection is recommended for coordination and a rough site visit, estimated at one full working day.
    • Rehabilitation of Water Abstraction Facilities: The overall project aims at the rehabilitation of water abstraction facilities, specifically at the Oybiner water intakes (Elfen- & Schulwiese) and the pumping station in Lückendorf.
    • Clarification of Rehabilitation Priority: In HOAI Service Phases 1 and 2, it needs to be clarified which abstraction facility requires priority rehabilitation.
    • Technical Implementation and Budgeting: Determining how the rehabilitations will be technically implemented, the timelines for implementation, and the necessary budgets.

    Specific deliverables and considerations for preliminary planning (Lph. 1+2) include:

    • Lückendorf Pumping Station:
    • Ensuring the Br.2-pump directly supplies the water treatment plant and the forester's house.
    • Continuing the Br.1-pump's direct supply over the "mountain."
    • Implementing parallel operation of both pumps to secure Zittau's water supply if Oybin water intakes fail.
    • Reviewing the continued use of the minimum quantity pump and the elevated tank.
    • Adapting MSR technology and integrating it with the control system to current standards.
    • Renewing the transformer station by June 30, 2028.
    • Rehabilitating DU shafts and the BEV on the raw water pipeline.
    • Equipping the shafts with intrusion detection systems.
    • Evaluating the necessity and timing for replacing the raw water pipeline from the Lückendorf pumping station to the water treatment plant.
    • Oybin Elfen- & Schulwiese Water Intakes:
    • Assessing if the Elfenwiese well needs renovation.
    • Determining if the raw water pipeline between Elfen- & Schulwiese needs cleaning, rehabilitation, or renewal.
    • Proposing methods for continued raw water extraction at WF Schulwiese, including the use of a siphon.
    • Providing for the installation of a submersible pump in case of new well construction.
    • Adapting the existing building to current standards.

    Sources

    • 1Ingenieurleistung-LP1-2_-Konzept-Wasserfassung.pdf — “vor Ort oder in der Region des AG erfolgen muss. Dennoch ist vor Beginn der Planung eine örtliche Besichtigung empfehlenswert. Für Abstimmungen und eine grobe Ortsbesichtigungen ist ein kompletter Arbeitstag vor Ort notw…
    • 2260728_Beschreibung-Vorhaben.pdf — “Beschreibung Vorhaben: Sanierung von Wassergewinnungsanlagen Einführung Die Stadtwerke Zittau GmbH (SWZ) betreiben im Zittauer Gebirge folgende sieben Wasserfassungen: Weißbach, Johannquelle, Lückendorf, Bürgerallee, Sch…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 6 FILES

    • 260730_Technologieschema-Oybin.pdf
    • Ingenieurleistung-LP1-2_-Konzept-Wasserfassung.pdf
    • 260728_Beschreibung-Vorhaben.pdf

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders