Published
Lieferung und Montage Netzersatzanlage KA Ostfildern
Notice number: ocds-mnwr74-25846220
KEY INFORMATION
- Submission deadline
- • Nov 3, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Stadt Ostfildern Freiflächenmanagement
- Accepted Languages
- German
- Tender type
- Contract Value
- Published date
- Sep 22, 2026
TENDER DESCRIPTION
This tender requires the supply and installation of a new KEV 150 emergency power generator set at the Kläranlage Ostfildern (Nellingen) facility, encompassing comprehensive delivery, complete functional assembly, operational connection, and on-site commissioning, including training for operating personnel. The scope also mandates the provision of detailed documentation, a factory acceptance test, and the establishment of a maintenance contract with annual inspections. Key technical requirements include software integration with the existing SPS/process control system via Modbus-TCP/IP and a Profinet to Modbus TCP gateway, along with full compliance with standards such as DGUV Vorschrift 3, DIN VDE 0100 Part 600, VDN/BDEW guidelines, and Netze BW GmbH regulations, including all necessary grid connection approvals. The contract execution is set to begin on December 7, 2026, with a completion deadline of June 30, 2027, requiring the delivery of foundation and installation drawings approximately eight weeks post-award. Bidders must submit proposals by November 3, 2026, at 11:00 AM, providing a declaration of annual turnover for the last three completed business years.
TENDER BRIEF
The contract timeline is as follows:
- Tender Deadline: The deadline for submitting bids is November 3, 2026, at 11:00 AM.
- Binding Period End: The binding period for bids ends on December 4, 2026.
- Contract Start Date (Execution Start): The execution of the contract is to begin on December 7, 2026.
- Completion Deadline: The work must be completed and ready for acceptance by June 30, 2027.
- Total Duration: From the start date of December 7, 2026, to the completion date of June 30, 2027, the total duration is approximately 6 months and 23 days.
- Key Milestones/Phases:
- Delivery of foundation plan and installation drawings: Approximately 8 weeks after the contract is awarded.
- Maintenance Contract: Testing by the manufacturer is to be conducted at a maximum of 300 operating hours or at the latest after one year.
Sources
- 1VOB_KVHB_KEV_110_1_B_A.pdf — “Urheberrechtlich geschützt - Nachahmung verboten! 60.600/040.2 Aufforderung zur Angebotsabgabe nach VOB/A Abschnitt 1-Oktober 2025- BOORBERG Richard Gmb Zum Verbleib beim Bieter bestimmt! Nicht mit dem Angebot zurückgebe…”
- 2VOB_KVHB_KEV_115_1_B_Ang.pdf — “IBOORBERG Urheberrechtlich geschützt - Nachahmung verboten! Richard Boorberg Verlag GmbH & Co KG 60.600/042.8 Angebotsschreiben nach VOB/A Abschnitt 1 Oktober 2025- PRO form KEV 115.1 (B) Ang Angebotsschreiben nach VOB/A…”
- 3VOB_KVHB_KEV_116_1_B_BVB.pdf — “Arbeitsplätze hat der Auftragnehmer zu beschaffen; die Kosten sind durch die Vertragspreise abgegolten. Verkehrswege innerhalb des Baugeländes: Urheberrechtlich geschützt - Nachahmung verboten! Richard Boorberg Verlag Gm…”
- 4KA_Ostf_NEA_Aggregat_LV_20260914.pdf — “| 14.09.2026 Alle Einzelbeträge Netto in EUR Seite 12 von 19 KA Ostf.-Nellingen Netzersatzversorgung LV 01.01 | Netzersatzanlage NEA Container Aggregat | DEM10024 OZ | Menge Einheit Preisanteile Eh.-Preis | Gesamt 01.01.…”
The core scope of work for this tender involves the "Neubau Netzersatzanlage" (New Emergency Power System) at the Kläranlage Ostfildern (Nellingen) facility. The primary service is the "Lieferung und Montage Netzersatzanlage KEV 150" (Delivery and Installation of the Emergency Power System KEV 150).
A high-level summary of the Statement of Work and core deliverables includes:
- Delivery and Installation: Providing, setting up, assembling, and operationally connecting the complete functional emergency power system, including all necessary transport, substructure, and assembly materials.
- Commissioning and Training: On-site commissioning at the Kläranlage Ostfildern-Nellingen, involving all required switching operations, and instructing operating personnel by a service technician.
- System Components: Implementation of the system with a fuel pump combination, featuring an electric pump, hand pump, overflow protection, and associated fuel lines.
- Quality Assurance: Conducting a factory acceptance test (with the client present) at the manufacturer's facility, including load tests at various levels.
- Documentation: Supplying a foundation plan and detailed installation/setup drawings (plan view, side views, detail plans, container views) for the entire emergency power system approximately eight weeks post-contract award.
- Maintenance and Inspections: Establishing a maintenance contract for the diesel power supply unit, which mandates an annual inspection (or after a maximum of 300 operating hours) by the manufacturer. This includes travel, labor, documentation, and specific maintenance tasks for both mechanical and electrical components. Additionally, an annual system inspection according to DGUV Vorschrift 3 and DIN VDE 0100 Part 600 is required, encompassing visual checks, functional tests, measurements (e.g., protective earth resistance, insulation resistance), and the provision of an inspection report.
- Software and Integration: Delivering software for the aggregate control unit to transmit commands, operational status, fault messages, measurements, setpoints, actual values, and counter values to the higher-level SPS/process control system (FlowChief) via Modbus-TCP/IP protocol. This involves coordinating with the bus coupling and PLS connection contractor and detailing all data points.
- Data Point Testing: Commissioning and testing all digital and analog inputs/outputs within the aggregate control unit individually, in collaboration with the SPS/PLS programmer, with all tested data points to be logged.
- Communication Gateway: Providing and installing a Profinet to Modbus TCP gateway for the control cabinet to ensure seamless data exchange between the two SPS systems, complete with necessary software and cabling.
- Regulatory Compliance: Preparing and submitting all official documents related to the emergency power system, covering contract creation, commissioning, certification, and registration for grid-parallel operation, through to final approval. This includes, but is not limited to, grid connection applications, commissioning protocols, data sheets, network feedback reports, safety device descriptions, and unit certificates.
- Environmental Monitoring: Supplying and installing an active room temperature sensor (PT 100) for wall or ceiling mounting, with a 4 to 20 mA output.
Sources
- 1VOB_KVHB_KEV_150_Titel_LB.pdf — “PRO form Titelblatt zur Leistungsbeschreibung Baumaßnahme: Neubau Netzersatzanlage in: Kläranlage Ostfildern (Nellingen) Leistung: Lieferung und Montage Netzersatzanlage KEV 150 Titel LB Titelblatt zur Leistungsbeschreib…”
- 2KA_Ostf_NEA_Aggregat_LV_20260914.pdf — “verschiedenen Laststufen. | | einschl. liefern, aufstellen, montieren und betriebsfertig anschließen der funktionsfertigen Anlage sowie Beistellung aller Transportmaterialien, Unterbaumaterial, Montagehilfsmaterial wie z…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 34 FILES
- KA_Ostf_NEA_Aggregat_LV_20260914.D8364 KBD83
- KA_Ostf_NEA_Aggregat_LV_20260914_V32.X83113 KBX83
- VOB_KVHB_KEV_176_1_B_AngErg_NU_1.pdf1.7 MBPDF
and 27 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.