Instandsetzung des Wasserkraftwerks Griesheim-Planungsauftrag
Notice number: ocds-mnwr74-0fcd2838-e8f4-412e-ad2d-a5f4107e32ff
KEY INFORMATION
- Submission deadline
- • Nov 12, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Wasserstraßen- und Schifffahrtsamt main
- Accepted Languages
- DEU
- Tender type
- Contract Value
- Published date
- Oct 13, 2026
TENDER DESCRIPTION
This tender solicits comprehensive planning services for the rehabilitation of the Griesheim Hydropower Plant, specifically involving the planning of rehabilitation measures for reinforced concrete components in the sluice track, lock platform, and weir footbridge areas. The scope includes HOAI Service Phases 1, 2, 3, 5, and 6 for object planning of engineering structures, and HOAI Service Phases 2, 3, 4, and 5 for structural engineering planning, alongside special services such as concrete-technology investigations. A rehabilitation concept conforming to ZTV-W/LB 219 is required, with technical execution necessitating adherence to standards like ITWO 2021, GAEB-XML 3.2, REB-VB 23.003, DA11-Format, STLK-Richtlinie, BSI-Standards for IT security, DBauKon Datenmodell 2012, and DIN EN ISO 13567-2. Offers must be submitted in German by November 12, 2026, at 11:00 AM, with the planning services anticipated to be performed between March 2027 and August 2027. Bidders must provide a "Self-declaration of Suitability" or ESPD, and all application documents, including those for subcontractors or reliance on other companies' capacities, must be in German or accompanied by certified German…
TENDER BRIEF
The contract timeline indicates a date of October 13, 2026, which is when the contract form was signed by the client. The contract pertains to planning services for the maintenance of the Griesheim Hydropower Plant.
Key milestones or phases are described according to the HOAI (Fee Schedule for Architects and Engineers) and include:
- Leistungsphase 1: Basic Evaluation.
- Leistungsphase 2: Preliminary Planning.
- Leistungsphase 3: Draft Planning.
- Leistungsphase 4: Approval Planning.
- Leistungsphase 5: Implementation Planning.
- Leistungsphase 6: Preparation of Award.
The honorarium is provisionally calculated for Leistungsphasen 1 to 3 and definitively for Leistungsphasen 5 to 6.
The contract does not explicitly state a contract start date, end date, or total duration.
Sources
- 1Vertrag_600-F_ftx_v1.13_RE_clean.pdf — “Bezeichnung der freiberuflichen Leistung: Instandsetzung des Wasserkraftwerks Griesheims - Planungsleistung Jahr Identnummer der Vergabestelle 810 Ordnungsnummer/Verfahrensnummer 2026 Aktenzeichen 3810W-214.02/0001-059 Z…”
- 2I07 631-F_Honorarermittlung_Ingenieurbauwerke_0121.docx — “colspan=2/> | I07 | Vertrags-Nr.: | 2026/810/15 Projekt: Instandsetzung des Wasserkraftwerks Griesheim - Planungsleistung C) Ermittlung der Honorarzone Bewertungs-merkmal | Honorarzone Isehr gering | Honorarzone IIgering…”
- 3I06 Bewertung der Leistung Tragwerksplanung FB-622_clean_clean.pdf — “| Ordnungszahl (OZ) | Beschreibung der Teilleistungen | Teil/ Anl. | $S/Ziff$ | Lph | BL | $L/GL$ | Leistung | v.Η. 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | Übertrag | | | | | | | 0,00 2.01 | Vorplanung - Leistungsphase 2 nac…”
- 4I05 Bewertung der Leistung Objektplanung FB-622_clean_clean.pdf — “Bewertung der Leistungen in v.H. der Honorare (Anlage Nr. 5 zu § 3 (1) des Vertrags) Jahr Nr. Bieter: 000015 Ordnungsnummer 2026 Bezeichnung der Leistung: Planungsleistung zur Instandsetzung des Wasserkraftwerks Grieshei…”
The core scope of work for this tender involves planning services for the renovation of the Griesheim hydropower plant ("Instandsetzung des Wasserkraftwerks Griesheim - Planungsleistung"). The statement of work is structured according to the HOAI (Fee Schedule for Architects and Engineers) and includes the following primary service phases (Leistungsphasen or LPH):
1. Objektplanung Ingenieurbauwerke (Object Planning for Engineering Structures):
- LPH 1: Basic Evaluation (Grundlagenermittlung): This involves clarifying the task, determining planning conditions, formulating decision-making aids, conducting site inspections, and documenting the findings.
- LPH 2: Preliminary Planning (Vorplanung): Activities include analyzing basic information, coordinating objectives, exploring solution options, developing and revising a planning concept, performing cost estimation, and documenting the results.
- LPH 3: Design Planning (Entwurfsplanung): This phase focuses on developing the design, calculating costs (including quantity determination), identifying key construction phases, and documenting the outcomes.
- LPH 5: Execution Planning (Ausführungsplanung): This involves creating detailed execution plans, providing graphical representations and explanations, and finalizing the planning for implementation.
- LPH 6: Preparation for Tendering (Vorbereiten der Vergabe): This phase includes preparing tender documents, defining critical execution stages, and compiling all necessary tendering materials.
2. Tragwerksplanung (Structural Engineering):
- LPH 2: Preliminary Planning (Vorplanung): Tasks include analyzing basic data, providing static-constructive advice, contributing to concept development, assisting with cost estimation, and documenting the results.
- LPH 3: Design Planning (Entwurfsplanung): This involves developing the structural solution, performing rough static calculations and dimensioning, establishing fundamental constructive details, estimating rebar quantities, contributing to cost calculations and scheduling, and documenting.
- LPH 4: Approval Planning (Genehmigungsplanung): Key activities include preparing verifiable static calculations, documenting standard construction conditions for engineering structures, creating position plans, assembling required documents, coordinating with testing authorities and engineers, and refining/correcting plans.
- LPH 5: Execution Planning (Ausführungsplanung): This phase focuses on detailing the results from phases 3 and 4 for execution.
Additionally, "Besondere Leistungen" (Special Services) include "Betontechnologische Untersuchungen" (Concrete technology investigations).
Sources
- 1I02 Leistungsbilder nach HOAI_clean.pdf — “Leistungsbeschreibung Anlage Nr. 102 (zu § 3 Abs. 1 des Vertrags) Bezeichnung der Leistung: Instandsetzung des Wasserkraftwerks Griesheims - Planungsleistung Jahr Identnummer der Nr. Ordnungsnummer 2026 Leistungsbilder n…”
- 2I05 Bewertung der Leistung Objektplanung FB-622_clean_clean.pdf — “Bewertung der Leistungen in v.H. der Honorare (Anlage Nr. 5 zu § 3 (1) des Vertrags) Jahr Nr. Bieter: 000015 Ordnungsnummer 2026 Bezeichnung der Leistung: Planungsleistung zur Instandsetzung des Wasserkraftwerks Grieshei…”
- 3I06 Bewertung der Leistung Tragwerksplanung FB-622_clean_clean.pdf — “Bewertung der Leistungen in v.H. der Honorare (Anlage Nr. 6 zu § 3 (1) des Vertrags) Jahr Nr. Bieter: 000015 Ordnungsnummer 2026 Bezeichnung der Leistung: Planungsleistung zur Instandsetzung des Wasserkraftwerks Grieshei…”
- 4I07 631-F_Honorarermittlung_Ingenieurbauwerke_0121.docx — “colspan=2/> | I07 | Vertrags-Nr.: | 2026/810/15 Projekt: Instandsetzung des Wasserkraftwerks Griesheim - Planungsleistung C) Ermittlung der Honorarzone Bewertungs-merkmal | Honorarzone Isehr gering | Honorarzone IIgering…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 22 FILES
- _Hinweise von der e-Vergabe.txt1 KBTXT
- I18 Teilnahmebedingungen_TW_131_L_F_v1.3x_clean.pdf18 KBPDF
- I14 AVA Vorgaben der WSV_clean.pdf213 KBPDF
and 15 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.